Skip to main content

VIDEO: Bridge demolition with excavators in Chattanooga

November 23, 2015
In Chattanooga Tennessee, an overpass for the SR153 route was demolished at the weekend using a fleet of excavators fitted with hydraulic worktools. The work was carried out during an overnight possession during which traffic was halted, with the highway then able to open again in the morning. A new overpass will take the traffic in place of the old structure.

Related Content

  • New demolition range from Hydraram
    February 3, 2020
    Hydraram has updated its range of demolition tools, including the HCC crushers, HCS combi cutters, HFP concrete pulverisers HFP-M concrete pulverisers with magnets, HRP rotating concrete pulverisers and HDG grabs.
  • Crane assembly for Tibet excavator
    February 9, 2017
    A tough machine assembly operation at extreme altitude has been carried out by two cranes from XCMG The cranes were used to assist in the assembly of a large excavator needed to assist in production at an extraction operation in Tibet. Located at an altitude of no less than 5,400m on the very remote Mila Mountain, the extraction sites was aiming at upgrading its operations and boosting productivity with the addition of a new 100tonne class excavator. The two cranes, an XCT100 model and a QAY300A machi
  • South Eastern Nigerian road project stalls
    July 24, 2019
    Construction work on the upgrade of the road connecting Calabar with Itu and Ikot Ekpene in South East Nigeria has once again ground to a halt. The contractor carrying out the work, Julius Berger, has transferred personnel and equipment to other projects. This action has been taken due to a delay in payments for the work to the contractor. The road is now in extremely poor condition, which is a key problem for transport between Cross River State and Akwa Ibom State. Much of the road is now said to be virt
  • Montreal’s Champlain Bridge opens but late and over-budget
    June 27, 2019
    Montreal’s US$3.5-billion, 3.4km-long Samuel de Champlain Bridge has opened after four years of construction and months of delays, according to Canadian media reports. Work is continuing on the cycle and pedestrian paths and eventually a light-rail train will run down the middle of the six lane bridge over the St. Lawrence River. The new structure has a life-span of 125 years and runs alongside its namesake Champlain Bridge, a steel truss cantilever that opened in 1962 which will be demolished. Accord