Skip to main content

VIDEO: Bridge demolition with excavators in Chattanooga

November 23, 2015
In Chattanooga Tennessee, an overpass for the SR153 route was demolished at the weekend using a fleet of excavators fitted with hydraulic worktools. The work was carried out during an overnight possession during which traffic was halted, with the highway then able to open again in the morning. A new overpass will take the traffic in place of the old structure.

Related Content

  • Norsenga Bridge undergoes weathering tests
    May 19, 2023
    Norway’s Statens Vegvesen says the wooden truss bridge – opened only in 2017 – will be the subject of a study in conjunction with the Norwegian University of Science and Technology.
  • Novel dual layer paving work in Germany
    February 2, 2017
    A German contractor is now using two novel asphalt paving technologies from Vögele together for key projects The firm has acquired Vögele’s InLine Pave equipment with its innovative dual layer paving technology as well as one of the SUPER 1800-3i SprayJets for paving a surface course. This combination of technologies is allowing contractor Rask Brandenburg to carry out fast and efficient road rehabilitation work on some major routes, including a busy Autobahn stretch leading into capital Berlin. T
  • Bertha ends her Alaskan Way voyage in Seattle
    December 21, 2017
    Seattle's State Route 99 viaduct is coming down. David Arminas was on site. Bertha, the world’s largest diameter earth pressure balance tunnel boring machine, with a cutterhead diameter of 17.5m, is no more. Her 2.7km journey underneath the waterfront area of Seattle finished on April 4 and the power went off for the last time on an extraordinary TBM that had finally completed an extraordinary job. “A small sidewalk job would have had more impact on city traffic than we have had,” says Brian Russell a v