Skip to main content

VIDEO: Bridge demolition with excavators in Chattanooga

November 23, 2015
In Chattanooga Tennessee, an overpass for the SR153 route was demolished at the weekend using a fleet of excavators fitted with hydraulic worktools. The work was carried out during an overnight possession during which traffic was halted, with the highway then able to open again in the morning. A new overpass will take the traffic in place of the old structure.

Related Content

  • Cold recycling in Monsanto, Portugal
    November 24, 2021
    A key machine used for the cold recycling train was the new Wirtgen W 380 CR, which made its debut for Pragosa on this construction site.
  • New bridge surfacing
    February 6, 2012
    A new wearing course applied by Bolidt on the entire eastern section of the Erasmus Bridge in Rotterdam is helping improve the surface for road users. The bridge forms an important link in the centre of the city of Rotterdam and using its equipment Bolidt was able to apply 3,000m2 of new wearing course on Erasmus Bridge in 4 hours. The Rotterdam authorities commissioned Bolidt again after the previous surface the firm applied, its Bridgedeck Up product, lasted over a decade. This time the work was carried o
  • Towers of power: California’s Gerald Desmond Bridge Replacement
    May 8, 2019
    Challenging ground conditions meant a design rethink - and some engineering firsts - for California’s Gerald Desmond Bridge Replacement Project* The Port of Long Beach on Terminal Island south of Los Angeles is the second-busiest container port in the US. It handles around 15% of all imported goods, much of it with Asia. As the Port of Long Beach was growing in importance over the past half century, the 51-year-old Gerald Desmond Bridge has faithfully been delivering thousands of daily commuters to wo
  • Novel demolition machines
    May 9, 2023
    The market for ruggedised demolition excavators has very specific requirements, with three new models now available – Mike Woof writes