Skip to main content

VIDEO: Bridge demolition with excavators in Chattanooga

November 23, 2015
In Chattanooga Tennessee, an overpass for the SR153 route was demolished at the weekend using a fleet of excavators fitted with hydraulic worktools. The work was carried out during an overnight possession during which traffic was halted, with the highway then able to open again in the morning. A new overpass will take the traffic in place of the old structure.

Related Content

  • Bridge design using flow modelling techniques
    February 17, 2012
    SBG has set numerous engineering precedents with its hugely innovative Jamarat Bridge project in Saudi Arabia
  • New demolition excavators
    April 29, 2025
    Extended reach excavators offers versatility for demolition works, with new models now available
  • The world’s longest suspension bridge
    June 24, 2024
    The world’s longest suspension bridge is the 1915 Çanakkale Bridge in Turkey. This engineering marvel links Gelibolu with Lapseki, forming a key section of the 101km highway linking Malkara with Çanakkale. *Article produced in partnership with the General Directorate of Highways (KGM), Ministry of Transport and Infrastructure, Republic of Türkiye.
  • Fast flyover removal with specialist demolition equipment
    July 12, 2012
    An overcrowded Indian flyover was removed in record time using specialist demolition equipment, as Patrick Smith reports Demolition of the landmark Lalbaug flyover south of central Mumbai has been completed and work on a new bigger bridge has started in India's largest city. Although the 38-year-old Sant Dnyaneshwar (Lalbaug flyover) two-lane, one-way traffic artery was serviceable and used by to 15,000 vehicles/hour, there were daily traffic jams and environmental consequences. Despite the complex and dema