Skip to main content

Vancouver’s 10-lane bridge replacement for Massey Tunnel remain undecided

October 23, 2015
Construction of a 10-lane bridge to replace a congested river tunnel in Vancouver, Canada, is still on target to start in 2017, despite details remaining sketchy.

The bridge will replace the 60-year-old George Massey Tunnel between the local cities of Richmond and Delta along the provincial Highway 99. But the cost and – importantly – whether it will be a toll bridge have not been declared by the British Columbia provincial government.

The Canadian Broadcasting Corporation reported last June that the BC government announced the project nearly three years ago. But the CBC noted that a consultation meeting with local residents failed to address many of their concerns.

"We're basically doing the same height as the Alex Fraser [bridge], but we're also factoring in a little bit of potential sea level change because of climate change. So that distance is about 57m," said Pam Ryan, planning director of the George Massey Tunnel Replacement Project.

Some technical studies have yet to be completed before the plan is finalised, but the timetable remains intact - construction start in 2017 and completion by 2022, the CBC reported.

It is still not clear if the George Massey Tunnel, also known as the Deas Island Tunnel, under the Fraser River will be decommissioned after the new bridge is opened. The government’s project group, George Massey Tunnel Replacement Project, has said the tunnel now carries its limit of 80,000 vehicles a day.

Extensive renovations to the tunnel and attempts to improve access roads have been done over the years, buy the group says only about 10 years of life is left in the tunnel itself. A video of the tunnel being constructed in the late 1950s is %$Linker: 2 External <?xml version="1.0" encoding="utf-16"?><dictionary /> 0 0 0 oLinkExternal available here Visit Youtube video page false https://www.youtube.com/watch?v=A1igKk8eK0M false false%>.

Related Content

  • VIDEO: Wheel loaders turn on each other in Chinese street battle
    April 19, 2016
    Irate Chinese construction workers decided enough was enough and took to the streets to settle their turf war, caught on video by a bystander. At one point, a wheel loader is seen charging in from the left, coming to the rescue of his overturned fellow loader. He almost rights the stricken machine that is lying on its side. After the dust had settle, their site managers might have had something to say about their use of company equipment. So where exactly to old dozers go to die? Are they carted of
  • Teams shortlisted for Pattullo Bridge replacement near Vancouver
    March 1, 2019
    The Canadian province of British Columbia has shortlisted three consortia to design and build a US$1.06 billion Pattullo Bridge replacement near Vancouver. Fraser Community Connectors is led by Kiewit Canada Development. Kiewet Infrastructure BC is the design-build contractor. The long-span bridge design contractors are T.Y. Lin International and International Bridge Technologies. A joint venture of Flatiron Constructors, Dragados Canada and Carlson Construction Pattullo includes ACS Infrastructure Ca
  • VIDEO: Foran Equipment helps Kananaskis kayakers construct course
    April 27, 2016
    In the Canadian Rocky Mountains, there was a window of opportunity of only several days before these excavators had to be out of the Kananaskis River ahead of nearby Barrier Dam releasing its water. The provincial Alberta Whitewater Association hired local contractor Foran Equipment to bring in their equipment in to re-work the riverbed after severe flooding in June 2013 washed out the kayaking courses. Southern parts of Alberta province suffered severe storms and massive flooding that month which devastate
  • Consortia line up for Denmark’s Storstrom Bridge project
    February 12, 2015
    Samsung, Daewoo, Hyundai, Acciona, Ed Züblin, MT Højgaard and Per Aarsleff are among the bidders to build a bridge connecting the Danish islands of Zealand and Falstser. The Danish Road Directorate expects to choose five pre-qualified consortia for the Storstrom Bridge project in May and the bids for the project are scheduled to be submitted by April 2016. The new bridge, likely to cost around €565 million including the cost of demolishing the old bridge it will replace, is expected to open by 2021, a