Skip to main content

Vancouver’s 10-lane bridge replacement for Massey Tunnel remain undecided

October 23, 2015
Construction of a 10-lane bridge to replace a congested river tunnel in Vancouver, Canada, is still on target to start in 2017, despite details remaining sketchy.

The bridge will replace the 60-year-old George Massey Tunnel between the local cities of Richmond and Delta along the provincial Highway 99. But the cost and – importantly – whether it will be a toll bridge have not been declared by the British Columbia provincial government.

The Canadian Broadcasting Corporation reported last June that the BC government announced the project nearly three years ago. But the CBC noted that a consultation meeting with local residents failed to address many of their concerns.

"We're basically doing the same height as the Alex Fraser [bridge], but we're also factoring in a little bit of potential sea level change because of climate change. So that distance is about 57m," said Pam Ryan, planning director of the George Massey Tunnel Replacement Project.

Some technical studies have yet to be completed before the plan is finalised, but the timetable remains intact - construction start in 2017 and completion by 2022, the CBC reported.

It is still not clear if the George Massey Tunnel, also known as the Deas Island Tunnel, under the Fraser River will be decommissioned after the new bridge is opened. The government’s project group, George Massey Tunnel Replacement Project, has said the tunnel now carries its limit of 80,000 vehicles a day.

Extensive renovations to the tunnel and attempts to improve access roads have been done over the years, buy the group says only about 10 years of life is left in the tunnel itself. A video of the tunnel being constructed in the late 1950s is %$Linker: 2 External <?xml version="1.0" encoding="utf-16"?><dictionary /> 0 0 0 oLinkExternal available here Visit Youtube video page false https://www.youtube.com/watch?v=A1igKk8eK0M false false%>.

Related Content

  • VIDEO: Freeway cycling is not for the faint hearted
    August 27, 2015
    Road designers and local authorities are getting much better at integrating roads for vehicles and cycle paths, tracks and lanes. But sometimes cyclist must take their chances on riding on a road with no designated cycle ways. Caution is essential for both cyclists and vehicle drivers, but in the end it will be the cyclist who is most likely to come off the worst in any crash. So why tempt fate, as the following news story and videos show.
  • European police group TISPOL committed to helping cut road deaths
    April 2, 2015
    In its latest three-year strategic plan, the European Traffic Police Network has reaffirmed its commitment to the European Union’s road death reduction target of 50% by 2020. World Highways reported last month that road deaths fell by just 1% in the EU in 2014, according to data released by the European Commission. There were 25,700 road deaths across all 28 Member States of the EU. The European Commissioner of Transport, Violeta Bulc said at the time that the statistics give some cause for concern. S
  • VIDEO: Queens University Belfast set record with Meccano bridge
    October 8, 2015
    A British university’s Big Bridge Build project has set a world record for the largest Meccano structure. Around 50 students from the School of Planning, Architecture and Civil Engineering at Queen’s University in Belfast, Northern Ireland, spent a year erecting the footbridge across the Clarendon Dock. The structure, at 28.5m long, was built using an estimated 11,000 pieces from Meccano, a children’s engineering construction toy. Laid end-to-end, the pieces would stretch for just under 4km.
  • Demolition of Seattle’s Alaskan Way Viaduct has started
    February 28, 2019
    Demolition has started on downtown Seattle’s old Alaskan Way Viaduct as part of a major waterfront redevelopment project that included the State Route 99 tunnel. According to Seattle media, Washington state is aiming to collect US$200 million in tolls from the 3.2km tunnel – which is now open - as part of the $3.3 billion replacement of the Alaskan Way Viaduct. However, tolling on the double-deck tunnel which has two lanes in each direction, plus an eight-foot safety shoulder, will not start until this s