Skip to main content

Use data to gather intelligence and be more efficient: Get on track for a brighter future

January 30, 2023

Successful contractors are employing connected construction technology to track where and when their road surface mix is being made, to predict when it will arrive on site, and to make sure their autonomous paving machinery is ready and waiting for it to arrive. Use pro-active maintenance. Prevent disruption to your project schedule. Track your productivity in real time and make the right decisions. The future is bright and its already here, say three leading experts on machine control.

Related Content

  • Efficient earthmoving builds new road links
    February 7, 2012
    Efficient earthmoving is allowing productive road construction in the Egyptian desert, Mike Woof reports. Despite ferocious desert temperatures, efficient earthmoving operations will help build new road links in Southern Egypt. Close to the Egyptian city of Assuit, the contractor Orascom is working on three key desert highway projects that will provide vital transport connections for the country's growing economy.
  • Polymer enhanced bitumen technology improves performance
    July 11, 2012
    As overall traffic volumes increase, the contribution from commercial vehicles with increased axle loads is growing, putting ever more strain on roads and highway maintenance budgets. Highway authorities are looking for products that will be able to cope better and are more cost effective over the life of a road. Technical innovation is the only way to answer this challenge effectively, says BP Bitumen, one of a number of specialist companies involved in bitumen technology.
  • Shaking all over: controlled frequency vibration for concrete
    November 28, 2018
    The use of controlled frequency vibration for concrete continues to grow, writes Paul Jaworski Controlled frequency vibration (CFV) technology has been around since the mid-1990s for concrete pavement applications. The technology has seen a gradual increase in acceptance, particularly in certain applications. For the 0- to 37mm (1.5”) slump pavement mix designs, many contractors were experiencing material separation due to speeds over 8,000vibrations/minute (VPM). With the wide variability of concrete
  • Well-educated personnel are the best investment for the future says the Ammann international training centre
    May 20, 2014
    Far too often, managers will view training as a luxury and not as a competitive and strategic necessity. Lazy team leaders regularly argue that it is a waste of time and money training their people, not least because these same trainees might subsequently leave the organisation. Courses are seen as an interruption, and a good way to delay things. There is always something much more pressing and important on the to-do list and staff can end up feeling forced into the training department. But these are weak a