Skip to main content

Use data to gather intelligence and be more efficient: Get on track for a brighter future

January 30, 2023

Successful contractors are employing connected construction technology to track where and when their road surface mix is being made, to predict when it will arrive on site, and to make sure their autonomous paving machinery is ready and waiting for it to arrive. Use pro-active maintenance. Prevent disruption to your project schedule. Track your productivity in real time and make the right decisions. The future is bright and its already here, say three leading experts on machine control.

Related Content

  • Novel concrete surfacing option used in Colorado
    December 10, 2015
    Proven polyester bridge deck surfacing technology is now being used more widely – Mike Woof writes. The benefits of using polymer concrete bridge deck overlays are well known and this technology is becoming widely used in the US. The system can improve protection for bridge surfaces and help extend the life of a bridge deck, as well as increasing skid resistance. In the last 25 years the use of these overlays has increased significantly in the US. These perform best when installed on bridge decks that are i
  • Sandvik’s landmark tech partnership with IBM
    March 6, 2017
    Sandvik Mining & Rock Technology has entered a landmark technology partnership with IBM that will see them work together on advanced analytics solutions to enhance safety, maintenance, productivity and operational services of rock excavation equipment.
  • Trimble helps bring Indonesia up to speed on the latest heavy construction technology
    March 28, 2014
    Indonesian infrastructure investment is seeing major highway expansion - Simon Gould writes Over the next 12 years, Indonesia has planned some massive infrastructure investments, under a master plan aimed at bringing it up to developed country status by 2025. Its Government’s Masterplan for Acceleration and Expansion of Indonesia's Economic Development (MP3EI) envisages infrastructure spending of US$400 billion between 2011 and 2025 to help achieve this (see sidebar for more on MP3EI). With limited funds of
  • Forming iconic structures
    July 18, 2012
    Specially designed and constructed formwork is being used to create some iconic bridges worldwide The Golden Ears Bridge over the Fraser River will unite the municipalities of Richmond, New Westminister and Delta in the scenic British Columbia province of Canada. The bridge, part of a CAD$800 million (US$670 million) project, is an 'extra dosed' cable stayed bridge, which means the deck will be supported by both cables and the structure itself. This design reduces the overall height of the two towers as req