Skip to main content

Trimble Dirtkhana helps to build a dirt-bike racers’ dream circuit

April 19, 2021

Watch Trimble model, design, build and maintain the perfect dirt-bike racing circuit. The end result is a spectacular ride and, as the bikes fly through the air, Trimble is on hand to make sure every jump and every landing gradient is built to perfection.

Exhibitions

For more information on companies in this article

Related Content

  • Trimble’s new technology helps optimise operations
    January 6, 2017
    Trimble is offering the integration of LOADRITE X2350 excavator scales and L2180 wheel loader scales with its latest management software. LOADRITE weighing systems help increase productivity and efficiency for excavator and wheel loader operations, allowing material movements to be tracked and creating more efficient loading.
  • Trimble’s new technology helps optimise operations
    March 8, 2014
    Trimble is offering the integration of LOADRITE X2350 excavator scales and L2180 wheel loader scales with its latest management software. LOADRITE weighing systems help increase productivity and efficiency for excavator and wheel loader operations, allowing material movements to be tracked and creating more efficient loading.
  • Far from formulaic
    January 4, 2013
    Formwork solutions for the first axial suspension cable stayed bridge in India; and a four-lane road bridge in Germany’s Harz Mountains, are among the latest bridge-based formwork projects analysed by Guy Woodford. RMD Kwikform India has won the contract to design and supply shoring and formwork solutions for the first axial suspension cable stayed bridge ever built in India. The Kota Bridge’s innovative design sees a single 350m span cross the entire width of the Chambal River, with three approach spans on
  • Formwork innovations help bridge building
    July 7, 2015
    A series of formwork developments are helping with challenging bridge construction projects around the world - Mike Woof writes In the Polish city of Krakow, a cost-effective cable stayed bridge is being constructed using a balanced cantilever technique. The current expansion of the Krakow metropolitan railway network (KST) requires the building of a crossing of the Krakow-Plaszow railway junction. Ensuring that daily rail operations remained unaffected during the construction of the 252m long crossing w