Skip to main content

Trimble Civil Construction: Data soaring through the cloud

February 21, 2025

Putting Lima, Peru on the map as a major hub in South America via a $2 billion airport rebuild was serious business. This 270,000 square meter challenge at Jorge Chávez International would require 7,000 collaborators to work from the same page — avoiding errors and rework that could jeopardise their timeline and budget.

For Sacyr Infrastructure, making sure all the lofty project expectations landed solid was a must, with next-level workflows and serious connectivity. Communication back and forth from office to field had to be seamless, for better accuracy, productivity and efficiency on the fly. The key? Accurate data, soaring through the cloud.

Learn more at: https://trimble.com/en/through-the-cloud

Exhibitions

For more information on companies in this article

Related Content

  • Caterpillar is gearing up for CONEXPO-CON/AGG 2023
    February 3, 2023
    Caterpillar is gearing up for a massive presence at the CONEXPO-CON/AGG 2023 exhibition.
  • Countdown is on: INTERMAT 2024 in Paris
    February 16, 2024
    Start today to build a better low-carbon tomorrow by registering to attend INTERMAT 2024, a global event for the building and civil engineering sector from April 24 to 27 at the Paris Nord Villepinte exhibition centre.
  • New Bocimi Toll Road Aims to Reduce Travel Time and Boost Indonesia’s Economy
    April 20, 2023
    The Bogor-Ciawi-Sukabumi (Bocimi) toll road is a series of national strategic projects to help reduce traffic congestion along the existing factory-lined roadway, as well as enhance regional connectivity and tourism in West Java. Spanning 54 kilometers, the new highway corridor is expected to shorten travel time between the Bogor and Sukabumi provinces from two hours to 30 minutes and boost economic conditions in the surrounding Sukabumi area. Construction is divided into four phases, the first of which measures 15.35 kilometers and is already complete. PT Waskita Karya (Waskita) is the main contractor for the IDR 2.1 trillion second section, spanning 11.9 kilometers between Cigombong and Cibadak, and set for completion in 2023 after being delayed due to the pandemic.
  • Data collection key to software developments
    February 13, 2012
    The collection and handling of data are key technology drivers in the software sector. New methods of data collection and manipulation are driving significant developments in software at present. The latest technology allows designers and engineers to collect, store and manipulate ever larger amounts of data. Growing use of mobile field equipment for both data collection and field management is driving interactive systems. And in an interview this month Autodesk senior vice-president for the construction an