Skip to main content

Trimble Civil Construction: Data soaring through the cloud

February 21, 2025

Putting Lima, Peru on the map as a major hub in South America via a $2 billion airport rebuild was serious business. This 270,000 square meter challenge at Jorge Chávez International would require 7,000 collaborators to work from the same page — avoiding errors and rework that could jeopardise their timeline and budget.

For Sacyr Infrastructure, making sure all the lofty project expectations landed solid was a must, with next-level workflows and serious connectivity. Communication back and forth from office to field had to be seamless, for better accuracy, productivity and efficiency on the fly. The key? Accurate data, soaring through the cloud.

Learn more at: https://trimble.com/en/through-the-cloud

Exhibitions

For more information on companies in this article

Related Content

  • Precision narrows the gap between design software and GIS
    March 20, 2012
    Greater precision is helping blur the boundaries between GIS technology and design software While GIS map based technology has extended its range across an ever more universal spectrum of uses in the highways sector, it is increasingly showing weaknesses for engineering purposes. It is very often not accurate enough. This has not mattered previously because the GIS tool has been seen essentially as an automated version of paper based systems from the design department's point of view. Where engineers
  • Chile’s Cau Cau bridge is to be rebuilt
    August 1, 2016
    The tender process for Chile’s Cau Cau Bridge rebuilding project is due to be opened in August 2016.
  • Colombian road focus change
    September 22, 2022
    A change in focus is coming for Colombian roads.
  • Compaction control boosts efficiency
    April 13, 2012
    Effective compaction control is one of a series of technical innovations boosting performance efficiency – Mike Woof writes. Maximising compaction efficiency can be a major cost factor on construction projects. Both for soil and asphalt compaction sectors, the risk from leaving an area under or over-compacted is substantial.