Skip to main content

Trimble Civil Construction: Data soaring through the cloud

February 21, 2025

Putting Lima, Peru on the map as a major hub in South America via a $2 billion airport rebuild was serious business. This 270,000 square meter challenge at Jorge Chávez International would require 7,000 collaborators to work from the same page — avoiding errors and rework that could jeopardise their timeline and budget.

For Sacyr Infrastructure, making sure all the lofty project expectations landed solid was a must, with next-level workflows and serious connectivity. Communication back and forth from office to field had to be seamless, for better accuracy, productivity and efficiency on the fly. The key? Accurate data, soaring through the cloud.

Learn more at: https://trimble.com/en/through-the-cloud

Exhibitions

For more information on companies in this article

Related Content

  • John Deere and Trimble Loadrite integrate LOADRITE L2180 Scale with John Deere WorkSight
    January 6, 2017
    John Deere and Trimble Loadrite announce the integration of LOADRITE L2180 Scale with John Deere WorkSight at Conexpo 2014. Wheeled loader production data can be viewed remotely in JDLink to boost loader productivity integration with the JDLink. The LOADRITE L2180 includes information such as total bucket loads, trucks loaded, and totals by material in addition to other JDLink data.
  • John Deere and Trimble Loadrite integrate LOADRITE L2180 Scale with John Deere WorkSight
    March 7, 2014
    John Deere and Trimble Loadrite announce the integration of LOADRITE L2180 Scale with John Deere WorkSight at Conexpo 2014. Wheeled loader production data can be viewed remotely in JDLink to boost loader productivity integration with the JDLink. The LOADRITE L2180 includes information such as total bucket loads, trucks loaded, and totals by material in addition to other JDLink data.
  • SWARCO delivers prism signs to Highways England
    December 14, 2020
    SWARCO Traffic has specified and installed 10 of its prism signs, managed by its cloud-based Zephyr solution, along the UK’s M6 motorway in northern England. The signs help to advise drivers of diversion routes and other traffic information and updates for Highways England along the M6 in county Cumbria.
  • Times they are a changing
    July 23, 2012
    Construction in China still appears to be on course for growth even with the gloomy economic outlook, as it enjoys "a strong budgets position." Patrick Smith reports One thing is certain in the current global economic climate: nothing is certain. And while China has not been unaffected by the economic events of recent months it has, according to Robert Zoellinck, president of the World Bank, a very strong current account and budgetary position. For some years, the nation has enjoyed double digit growth (the