Skip to main content

Topcon targets concrete industry

March 10, 2017

Using robotic total stations and Millimeter GPS, Topcon’s ZS100 combines two existing technologies to give operators fewer set-ups, fewer instruments – and a much simpler job site

Exhibitions

Related Content

  • Remote surveying and scanning
    January 18, 2022
    Remote surveying and scanning can be achieved using the autonomous robotic system available from Trimble. The package combines the Spot robot autonomous rover unit with the Trimble X7 3D laser scanner and Trimble FieldLink software.
  • Caterpillar's improved dozers with new Grade Control systems
    March 15, 2017
    Caterpillar is now offering its sophisticated 3D Cat Grade Control package on its smaller dozers, the D3K2, D4K2, and D5K2 models. This allows more efficient working along with higher accuracy and productivity, while lowering operating costs. The package has integrated roof-mounted antennas. The AccuGrade Ready Option is part of the package, allowing other Cat GRADE technologies to be used, such as AccuGrade Laser or a universal total station when satellite reception is limited. The system provides an
  • Sokkia’s sophisticated survey system
    May 25, 2016
    Sokkia is now adding two new editions to its CX total station series, both featuring enhanced reflectorless operation. The new CX-50 is designed to provide an entry-level option with a fast and powerful EDM. The CX-100LN is built to offer a long-range reflectorless EDM. The CX-50 is said to be easy to use and highly accurate, offering reflectorless electronic distance measurement (EDM) of up to 350m, and EDM of 4,000m with the use of a prism. The firm says that in addition, the CX-100LN features a 2,000m
  • JCB excavators JS220 and 370 work close to home
    May 14, 2018
    A fleet of JCB excavators is playing a major role in a road construction project only metres from the factory where they were built. Derbyshire-based earthmoving specialist JC Balls is working for a Carillion-Tarmac joint venture on the A50 Growth Corridor Project A. The contract is part of the National Infrastructure Plan and consists of constructing a grade-separated junction on the A50 dual carriageway to the west of the town of Uttoxeter. Project managed by Amey, the scheme is creating three new