Skip to main content

Topcon Positioning Systems unveils Hyper XR: High-Precision GNSS receiver redefines field accuracy

May 19, 2025

Global Product Launch: Topcon’s new Hyper XR GNSS receiver is changing the game in surveying, construction, and geospatial work. With full satellite access, 60° tilt compensation, and calibration-free setup, it delivers unmatched precision—even in challenging environments. Paired with the FC-6400 Windows 11 tablet, this streamlined system offers intuitive workflows and cutting-edge performance. 

Learn how Topcon is pushing boundaries with its most advanced receiver yet. 

To see more content from bauma 2025, visit the dedicated page of our website: https://www.globalhighways.com/bauma-2025 

Exhibitions

For more information on companies in this article

Related Content

  • Topcon’s new Enterprise Solutions workflow management system controls all jobs
    March 7, 2014
    Topcon Positioning Group has released a new workflow management system designed to connect all of a contractor’s sites, data, crews and equipment. Unveiled at Conexpo 2014 this week, Topcon Enterprise Solutions offers constant communication, data sharing, scheduling, updating, support activities and accurate productivity data in real-time, no matter where the job or office is located.
  • Best practices in road asset management
    February 10, 2021
    Maintaining roads efficiently is a complex task. Road maintenance organisations are looking for more efficient, cost-effective, and safe ways to maintain their networks. This means optimisation across the board: network inspections, maintenance programming, and inventory management.
  • Accurate utilities detection
    November 26, 2024

    Trimble and Radiodetection are collaborating to improve the technology used in the utility measurement and mapping process. Integrating the Trimble Catalyst DA2 GNSS system and Radiodetection’s RD MapTM+ application and precision locator products helps to streamline utility-locating workflows to provide accurate measurement capabilities and generate underground utilities maps in a single field operation.

  • Ebolowa-Kribi in Cameroon’s 2025 goals
    January 20, 2025
    Emmanuel Nganou Djoumessi, Cameroon’s minister of public works, has earmarked the Ebolowa-Kribi road via Akom II among major highway projects to be completed in 2025.