Skip to main content

South Halls

January 10, 2017
Over 300,000 square feet and 440+ exhibitors displaying the latest in concrete construction, trucking, engines, components, electronics & more.
Exhibitions

Related Content

  • IronDirect: New reman effort could cut truck fleet costs in half
    March 10, 2017
    A new remanufactured truck service from IronDirect will allow construction contractors and fleet operators to purchase like-new remanufactured vehicles for about half the cost of similarly-equipped new trucks, the company said at CONEXPO-CON/AGG.
  • Lombardini powers up the 8kW KD15-440
    January 6, 2017
    The Kohler/Lombardini group will use Bauma to update its range of air-cooled single cylinder diesel engines, unveiling the new 8kW KD15-440 engine which the manufacturer says will strengthen and improve the current 15LD series - elevating it to the top of the class within its power range. The KD15-440 is an air-cooled single cylinder diesel engine with a displacement of 441cc and an air filter that can offer, Lombardini claims, an operating life five times greater than the current version via its new high-e
  • Lombardini powers up the 8kW KD15-440
    February 15, 2013
    The Kohler/Lombardini group will use Bauma to update its range of air-cooled single cylinder diesel engines, unveiling the new 8kW KD15-440 engine which the manufacturer says will strengthen and improve the current 15LD series - elevating it to the top of the class within its power range. The KD15-440 is an air-cooled single cylinder diesel engine with a displacement of 441cc and an air filter that can offer, Lombardini claims, an operating life five times greater than the current version via its new high-e
  • India’s new highway project
    March 24, 2017
    India’s Eastern Peripheral Expressway project is now moving forward - Partha Pratim Basistha reports. Work on the 12- year pending, National, Eastern Peripheral Expressway-2, surrounding India’s National Capital, Delhi and its National Capital Region (NCR) has finally commenced. The project involves the North Indian states of Haryana and Uttar Pradesh and this development follows the approval of India’s Supreme Court. The project was held up due to land acquisition issues. Contractors are now in the process