Skip to main content

Roadtec RX-600eLR miller cuts flush to left and the right

April 15, 2016

Astec has brought its new Roadtec RX-600eLR half-lane milling machine to bauma 2016. Able to cut flush on the left and the right hand side of the road, the RX-600eLR offers contractors a 2m-wide, 60cm-deep cutter and a drum driven by two hydrostatic motors, one mounted on either side of the machine.

Exhibitions

Related Content

  • Advanced soil compaction technology coming to market
    March 17, 2016
    Several major manufacturers are introducing new technology for the soil compaction market - Mike Woof writes With the bauma 2016 exhibition drawing near, several major manufacturers are looking to expand their respective ranges of soil compactors, as well as to introduce innovative new technologies to the sector. Ammann is offering new models in the shape of its ARS 200 and ARS 220, both of which are Tier 4 Final/Stage IV compliant. These 20tonne and 22tonne class machines feature newly designed cab
  • Jeffery Lee Richmond sr obituary
    July 6, 2016
    The former president of Roadtec Inc, Jeffery Lee Richmond Sr, passed away June 30th, 2016. Richmond had worked for Roadtec for 20 years and took over as president of the business in 2004. Although he was born in Illinois in 1955, he had lived in Chattanooga TN, where Roadtec is based, since 1966. Richmond was a major driving force within Roadtec, part of the Astec Group. Under Richmond’s leadership, Roadtec strengthened its international presence significantly, developing sales of its road construction mac
  • Taking the coast road on Reunion Island
    April 4, 2017
    An ambitious project on Reunion Island will improve transport
  • MAT Mischanlagentechnik debuts BE-2550 technology in Switzerland
    April 12, 2018
    The Bauer subsidiary MAT Mischanlagentechnik, known for microtunneling technology, has entered the large-diameter tunnelling market with its BE-2550 separating plant in Switzerland. The double-track Eppenberg tunnel in the Swiss canton of Solothurn is about 2.6 km long and is one of the busiest railway routes in Switzerland. Since November 2016, a 2,400tonne tunnel boring machine measuring around 115m long and 12.75m in diameter has been drilling through the mountain. The machine has been operating in the