Skip to main content

Roadtec RX-600eLR miller cuts flush to left and the right

April 15, 2016

Astec has brought its new Roadtec RX-600eLR half-lane milling machine to bauma 2016. Able to cut flush on the left and the right hand side of the road, the RX-600eLR offers contractors a 2m-wide, 60cm-deep cutter and a drum driven by two hydrostatic motors, one mounted on either side of the machine.

Exhibitions

Related Content

  • Topcon: A revolution in construction technology’s coming
    July 7, 2021
    The construction equipment industry is at a turning point. Topcon’s senior leaders believe that we are about to see a huge surge in the adoption of new construction technologies. The time is ripe as a new, younger and more tech-savvy generation comes to the fore. Governments could save billions, and where does the smartphone fit in?
  • Fayat is positioned for growth
    January 6, 2017
    Market conditions are tough, according to Jean-Claude Fayat, executive managing director of the Fayat Group. He said, “From my point of view this crisis is not over. We have a slow recovery but this is a structural crisis and a new balance has to be found.” Despite the difficult conditions, the company is performing well and Fayat said, “Our group turnover is around €3.7 billion/year. We are a family group and we have never wanted to be on the stock exchange.” The European market has become less important
  • Fayat is positioned for growth
    April 18, 2013
    Market conditions are tough, according to Jean-Claude Fayat, executive managing director of the Fayat Group. He said, “From my point of view this crisis is not over. We have a slow recovery but this is a structural crisis and a new balance has to be found.” Despite the difficult conditions, the company is performing well and Fayat said, “Our group turnover is around €3.7 billion/year. We are a family group and we have never wanted to be on the stock exchange.” The European market has become less important
  • Building a replacement bridge in record time
    March 13, 2023
    The construction of a new bridge in Pittsburgh, Pennsylvania to replace a collapsed structure has been carried out in record time