Skip to main content

Roadtec RX-600eLR miller cuts flush to left and the right

April 15, 2016

Astec has brought its new Roadtec RX-600eLR half-lane milling machine to bauma 2016. Able to cut flush on the left and the right hand side of the road, the RX-600eLR offers contractors a 2m-wide, 60cm-deep cutter and a drum driven by two hydrostatic motors, one mounted on either side of the machine.

Exhibitions

Related Content

  • German bridge demolition work assisted by Liebherr
    May 9, 2022
    Construction equipment from Liebherr has played an important role in the project to demolish a bridge in Germany.
  • Scotland’s new Queensferry Crossing over the Forth Estuary
    December 23, 2015
    The new Queensferry Crossing under construction in Scotland will be the third landmark bridge spanning the Forth Estuary - Mike Woof writes When the new Queensferry Crossing over the Forth Estuary opens at the end of 2016, it will be the third landmark bridge to be built spanning this short stretch of water. Lying alongside the existing road bridge and the historic rail bridge, this new structure will be as groundbreaking as the two earlier crossings were at the time of their construction.
  • Manitou extends MRT Easy range
    April 14, 2016
    Manitou has extended its MRT Easy range of rotating telehandlers with the MRT2145. Sitting above the existing MRT1840 with its 18m, 4tonne lift, the new MRT2145 offers a maximum lift height of 21m, and a 4.5tonne lift capacity. The increased capacity, said Manitou, is a result of using a new design of stabiliser that offers a wider footprint but retains a compact design when folded.
  • New Doha highway under construction
    March 18, 2016
    Construction is now underway on the New Orbital Highway in Doha, Qatar. This project is called The New Orbital Highway contract 2 and is one of the largest projects being delivered through the Qatar’s public work authority Ashghal. The work consists of the design and construction of 47km of highway with a five-lane dual carriageway for light vehicles and two truck lanes in each direction. It also includes six viaducts, 17 bridges and underpasses and a 320m cut-and-cover tunnel. This last is particularly