Skip to main content

The Road Zipper™ system: Moveability Vs Traditional Barriers

June 1, 2025

Improve construction project efficiency while saving lives and improving quality of life with the Road Zipper System™. As the world’s population grows, roads and highways must be expanded. The Road Zipper provides positive protection in work zones plus on-demand flexibility requiring minimum labor to increase windows of time for crews to work safely. As an all-in-one traffic management system, the Road Zipper also quickly and seamlessly shifts lanes to maximize traffic flow for commuters, reducing the risk of accidents and saving thousands of hours of drive time.

Content produced in association with Lindsay Corporation

Exhibitions

For more information on companies in this article

Related Content

  • Dana and Mecalac announce electric drive collaboration
    July 19, 2018
    Dana and Mecalac have collaborated to develop an innovative wheeled excavator featuring an all-electric drivetrain. The firms have developed the special e-Drivetrain system for the new Mecalac e12 electric compact wheeled excavator. This machine recently won the Energy Transition Award as part of the 2018 Intermat Innovation Awards. Based on the proven Mecalac 12MTX model, this version is the world’s first all-electric compact wheeled excavator. The machine features Spicer 112 axles and a Spicer 367 shift-
  • Evonik hosts awards ceremony in Thailand
    November 18, 2016
    Evonik Industries recently hosted an award ceremony at the Residence of the German Ambassador in Thailand’s capital Bangkok. Evonik used the event to present the “Evonik Road Safety Award” to the Department of Rural Roads, Thailand (DRR). This is in recognition for the DRR’s contributions to road safety in Thailand, especially in rural areas.
  • Multiple asphalt plants supply major highway construction
    July 12, 2012
    One company has produced eight asphalt plants for a major project, and others are introducing new models as Patrick Smith reports Algeria's US$11.2 billion East-West Highway development, the world's largest current highway construction project, forms part of the larger Trans-Maghreb Motorway project, and is scheduled for completion in 2010. It will run for 1,216km, ensuring the link between Annaba in the north-east and Tlemcen in the north-west, passing directly through 24 provinces and linking Algeria to T
  • Maximising Earthworks Productivity with Topcon’s Auto Excavator
    December 14, 2021
    In a recent McKinsey survey of 400 construction industry CxOs, 87 per cent said that skilled labour was becoming increasingly scarce and expensive, and almost half said this will impact the whole industry in the next year (1)