Skip to main content

Revolutionising safety in crushing & screening: inside Metso’s circular approach

May 27, 2025

Global Product Launch: The construction industry is moving toward a circular economy—and Metso is leading the way with innovative safety-first crushing and screening solutions. We explore how their HRC8 system improves access, reduces confined space work, and uses remote monitoring to protect workers. Hear from experts about the new industry standards that are reshaping on-site safety. 

To see more content from bauma 2025, visit the dedicated page of our website: https://www.globalhighways.com/bauma-2025

Exhibitions

For more information on companies in this article

Related Content

  • Cebu-Cordova Link Expressway opens
    April 28, 2022
    The 8.5km expressway, in which Cowi was owners engineer for the client Metro Pacific Tollways, incorporates the longest and tallest bridge in the Philippines.
  • Metso unveils innovative two-in-one Lokotrack LT220D
    March 5, 2014
    Metso has unveiled its innovative two-in-one Lokotrack LT220D, the latest addition to its mobile crushing and screening equipment range. Claiming it to be the most compact track-mounted combination of a cone crusher and a screen ever made, the company says the combination into a single track-mounted plant will reduce operational costs in several ways, most notably by substantially lowering fuel consumption and reducing the need for maintenance. In addition, the unit is compact and highly transportable.
  • Metso unveils innovative two-in-one Lokotrack LT220D
    January 6, 2017
    Metso has unveiled its innovative two-in-one Lokotrack LT220D, the latest addition to its mobile crushing and screening equipment range. Claiming it to be the most compact track-mounted combination of a cone crusher and a screen ever made, the company says the combination into a single track-mounted plant will reduce operational costs in several ways, most notably by substantially lowering fuel consumption and reducing the need for maintenance. In addition, the unit is compact and highly transportable.
  • Koh Samui-Surat Thani bridge still on
    April 14, 2025
    Surachet Laopoolsuk, head of the Expressway Authority, Exat, reportedly said that the bridge could be open by 2034.