Skip to main content

Pilosio’s new tunnel system

April 18, 2016

A new tunnel formwork system from Pilosio reduces the time needed for assembly. Made from standard components, this can be used for a wide range of geometries.

Exhibitions

Related Content

  • Rockmore International’s new Vector Rod System offers greater performance
    January 23, 2017
    Rockmore International is unveiling its new Vector Rod System, which is claimed to be a major breakthrough in improving performance and service life of extension drill tools. Suitable for surface and underground percussive drilling applications, Rockmore International’s (Rockmore) new line of drill tools are said to offer tremendous advantages in productivity and reliability.
  • Tubeshor shoring system
    December 10, 2024

    Altrad RMD Kwikform has launched a solution to reduce the effects of thermal loading - the Tubeshor Active Thermal Compensator, ATC.

    The Tubeshor hybrid hydraulic shoring system is used for propping waler beams or capping beams of large excavations. Altrad RMD Kwikform, an above and below ground temporary works specialist, said it comes in a range of diameters to cater for all duties of shoring requirement.

  • Swiss roundabout goes underground
    February 7, 2012
    The Swiss, well-known for their tunnel constructions, have enhanced their reputation with the recent Gotthard Tunnel breakthrough which has created the world's longest tunnel. And in Bern, a roundabout is being re-positioned almost 10m under the ground, which will transform a somewhat dismal road intersection into an attractive gateway to the country's capital. PERI provided a comprehensive formwork solution for the realisation of the massive beams, reinforced concrete slab along with the conically-sh
  • Bilbao benefits from major tunnel project
    February 10, 2012
    The northern Spanish city of Bilbao looks set to benefit from a major tunnel construction project aimed at reducing traffic congestion on its vehicle clogged streets. The city is building a new underground metro section, Line 3, which will help carry commuters to and from the city's commercial centre and help reduce vehicle journey times on the surface. This project is also making use of the latest piece of tunnelling equipment from Sandvik, the MT520 roadheader, a powerful machine designed and built at