A new tunnel formwork system from Pilosio reduces the time needed for assembly. Made from standard components, this can be used for a wide range of geometries.
The completion of Colombia’s long-running La Linea Tunnel project is now in sight, finally. Colombia’s president, Juan Manuel Santos, and vice president, German Vargas Lleras, made a joint announcement that the 8.65km long tunnel will be inaugurated in November 2016. The two tunnel drives (from Quindio and Tolima) have now met in the middle and only lining works are left to be completed. Once the tunnel is operational, it will enable trucks to complete the journey between Cajamarca (Tolima) and Calarca (Qui
A combination of engine and driveline technologies will reduce fuel consumption and increase performance in new generation, low emission machines
A wide array of new engine and driveline technologies being developed will help reduce emissions and fuel consumption, while increasing performance in the
latest machines coming to market. With engine manufacturers focussing on the Tier 4 Interim/ Stage IIIB and following Tier 4 Final/Stage IV emissions requirements for North America and Europe, sophisticated