This automatic unit from Controls Group uses no solvent so there are no fumes, making it extremely safe for the operator. The test takes only 40 minutes.
The UK could build one of Europe’s longest road tunnels as it considers route options for a new major link connecting the cities of Manchester and Sheffield in England. An interim report looking at how best to connect the cities suggested that the road could be between 40km-50km, depending on the route. It “will include a tunnelled section, which could range from between 20-30km, making it one of the longest road tunnels ever built”.
Volvo CE is commencing operations of its low emission quarrying operation in Sweden. The facility has a strong focus on electric machines, with diesel-electric hybrid equipment also being used. According to the firm, this is a world first for a quarry facility that can be run almost 'emission-free'. Volvo CE and its customer Skanska have now commenced testing the viability of the Electric Site concept at Skanska’s Vikan Kross quarry, located near Gothenburg in Sweden. The production system at the site
Gomaco’s new 4400 slipform paver could help the company cash in on new European Union CE certification for highway safety barriers.
The 4400 makes Gomaco one of only a handful of manufacturers with equipment to slipform the Brit Pave Safety Barrier – the only barrier that currently meets new European Union CE certification for highways set to become compulsory in July 2013. Rory Keogh, Gomaco’s managing director for Europe, Middle East, Africa, and CIS, is excited about the potential market for the firm’s