Skip to main content

The new Polcevera Viaduct

The construction project for the new Polcevera Viaduct is a source of pride for Italy in these difficult times, and the completion of the deck structure has been a cause for celebration.
April 30, 2020
Exhibitions

Related Content

  • New Holland's new wheel loaders
    February 6, 2012
    New Holland used the Hillhead quarrying and recycling show near Buxton, England, to display two new wheel loader models, the W190B and W270B. The company claims that the W270B offers high productivity and stability in operation. Power comes from a 239kW diesel that meets US and European emissions requirements while the machine runs on axles with integrated multi-disk brakes and self-locking differentials for high traction on slippery and uneven ground. High breakout forces and productivity are claimed while
  • New highways for New South Wales
    May 28, 2012
    Work on the eastern section of the Hunter Expressway project in New South Wales in Australia will be carried out by Theiss. The firm won the deal for preliminary design and development of the US$736 million (A$825 million) project, which is for a 13.3km section of the link. Theiss is working on the project with Hyder Consulting and Parsons Brinkerhoff. Once the Hunter Expressway is complete in late 2013, it will cut travel times from the Hunter to Newcastle by 28 minutes.
  • JCB: new factory and new excavator
    July 10, 2012
    JCB has launched the brand new JS360 Auto tracked excavator to compete in the global market for excavators in the 33-40tonne market sector, marking the company's first entry in the higher end of this weight class. It will join the company's JS range of tracked and wheeled excavators, one of more than 300 products manufactured by the company, which offers a comprehensive range of 25 tracked and wheeled excavator models from 7-46tonnes.
  • New airport for Papua New Guinea
    August 21, 2013
    A new airport has been constructed in the southern highlands of Papua New Guinea that will help with communications and logistics for the development of a natural gas project in the area. Built at Komo, the airport is sufficiently large to be able to handle the massive Russian Antonov AH-124-100 transport aircraft. Construction of the airport however proved challenging as the climate in this mountainous area is known for its changeable weather and heavy seasonal rainfall. However the airport was need