Skip to main content

The new cold recycler generation from Wirtgen

January 6, 2017
And the focus is on 3 significant highlights that define this new standard:

  1. Perfect all round view, "unmatched" operating concept with all information for the machine operator inside the cabin.
  2. Impressive performance, powerful drive for the milling and mixing motor, traction for the trickiest ground conditions.
  3. High mix quality, precise metering of binding agents, perfect and thoroughly homogeneous mixing.

The new WR generation is the result of "our passion for state-of-the-art construction methods".
No video provider was found to handle the given URL. See the documentation for more information.
Exhibitions

Related Content

  • Better roads through asphalt plant innovation
    August 19, 2014
    In Africa, one of the world’s fastest-growing cities is using the latest asphalt plant technology to boost its road maintenance work; while leading firms are finding their innovative solutions in demand in Europe and the Americas. Guy Woodford reports A new up to 180tonnes/hour Marini UltiMAP 2000 plant is helping Lagos State Public Works in Lagos, Nigeria implement a five-year strategic road map aiming to ensure high standards of road maintenance and improve infrastructural development across the city of m
  • Delivering the smoothest road surfaces
    May 26, 2021
    Roads and highways have to be monitored and maintained regularly to ensure they are safe for use, and surface smoothness is a key factor for road quality. However, for racetracks (and airport runways) surface smoothness is even more important for safety and performance
  • All aboard the Wirtgen paving train on Germany’s A7 project
    February 21, 2019
    The A7 is being widened between Hamburg and Bordesholm from four lanes to six - in some places to eight - to ensure the motorway remains an efficient traffic artery. The aim is to create a pavement with a high degree of driving comfort but which withstands the loads of heavy-goods traffic. For widening the 60km stretch in the Schleswig-Holstein region, consortium Via Solutions Nord and joint venture ARGE A7 Hamburg-Bordesholm opted for steel reinforced concrete paving with an exposed aggregate concrete s
  • Wirtgen’s rapid road rehab
    April 30, 2024

    It’s a picturesque Sicilian landscape of small roads stretching up and down hills and around tight curves. But when these small roads need big renovations, it takes a large machine to do it fast and efficiently. This is why a contractor chose the W 210 Fi large milling machine which can mill up the entire roadway in two-to-three passes.