Skip to main content

Montreal bridge demolished using breakers – VIDEO

October 20, 2014
A demolition contractor in Canada has carried out a successful demolition of an old bridge in Montreal. The bridge crossed the 401 highway and was removed over a weekend. Work was carried out through the night for the structure to be removed within the allotted timeframe.

Related Content

  • Explosive demolition for Kansas City bridge
    June 9, 2014
    Explosive demolition was used to remove an aged bridge in Kansas City on Saturday 7th June.
  • Montreal’s new Champlain Bridge is shaping up for Christmas
    September 10, 2018
    Montreal’s Champlain Bridges - one going up, one coming down, reports David Arminas The importance of the new Champlain Bridge to Montreal and Canada can’t be overstated, given the crumbling nature of the not-so-old original Champlain Bridge. The original steel truss affair across the St Lawrence River and the adjacent St Lawrence Seaway canal is “a lifeline for residents and businesses” in greater Montréal, according to the national Auditor General - the public sector spending watchdog. “It accommodates
  • Contractor uses explosives to demolish Brazilian overpass
    December 2, 2013
    A demolition contractor has carried out an explosive demolition on an overpass in Brazilian city, Rio de Janeiro. The demolition work is being carried out as part of the upgrades to the city’s port district in preparation for the 2016 Olympic Games. Around 1tonne of explosives were used to place charges at key points within the structure of the Perimetral overpass. The demolition work was successful and the structure was brought down safely without incident.
  • Busy UK motorway junction demolished in tight time frame – Mark Anthony reports
    October 18, 2012
    Military-style planning and overwhelming demolition firepower ensured that Armac Group avoided financial penalties and the wrath of drivers on one of the UK’s busiest motorway intersections. Demolition & Dismantling reports. 6 January is traditionally known for the visit of the three wise men to Bethlehem. However, on 6 January 2012, three wise demolition engineers from Armac Group was tasked with dismantling the monumental structure known as Catthorpe Viaduct: the main overbridge of the M6/M1/A14 interc