Skip to main content

Machine control is about saving time and money

May 19, 2016

Improving operating efficiency through technology is no longer a revolutionary idea … it’s absolutely necessary if you want your business to survive say industry leaders Trimble, MOBA, Topcon and Leica Geosystems.

Exhibitions

Related Content

  • MOBA machine control tools help in asphalt paving
    January 12, 2015
    Machine control systems from MOBA are playing an important role in laying out a new street in the southern German village of Apfeldorf in Bavaria. New development in the village is seeing the construction of 14 new homes as well as a new street being built and the time savings and cost savings of machine control systems are proving highly beneficial. Although well proven in larger projects, these technologies are now being used in smaller construction projects also, with major advantages for the users. Loc
  • Trimble’s innovative machine control tools
    June 24, 2024
    Trimble is introducing an array of technology solutions for machine control as well as surveying.
  • Mobile mapping innovation
    June 1, 2022
    There are millions of kilometres of roads and features that need to be mapped in today’s world. We see a strong vision and application for the future, therefore Leica Geosystems, part of Hexagon, recently announced the introduction of the reality capture mobile mapping system Leica Pegasus TRK, introducing artificial intelligence, autonomous workflows and intuitive interfaces. This technology goes beyond the capabilities of what’s already been done, making it the perfect companion for today’s mobile mapping requirements.
  • Topcon’s asset monitoring system offers security
    April 26, 2018
    Deformation monitoring is presenting a major business development for Topcon Positioning. Chris Emery, business manager monitoring solutions Europe, called it the biggest growth area in his business segment. At the moment, the asset life extension segment is growing at around 25% per year for Topcon. Emery said: “The problem is that, post war, so many structures were built. They’re now coming to the end of their design life, or have even gone past their design life.” He said that the package is able to