Skip to main content

Lucky escape for driver of plummeting excavator in Ohio

July 21, 2015
Thankfully no workers were injured when an excavator plummeted onto a road during a bridge demolition in the US state of Ohio.

An amateur video captures the moment the bridge gave way, leaving a second excavator luckily in place on the other half of the bridge.

The incident occurs at the very start of the video clip, so viewers may have to ‘rewind’ several times to get the best picture of the excavator hitting the ground.

Related Content

  • Eradicating work zone danger
    June 26, 2013
    New safety systems for highway work zones are helping to reduce deaths and injuries in the United States, while much work is being done in Europe to improve work zone safety. Guy Woodford reports. With more road building underway than at any one time in Texas history, the US Lone Star state’s Department of Transportation (TxDOT) is introducing its first highway safety system with queue-warning technology and temporary rumble strips to cut work zone collisions. Debuting along a central Texas stretch of the
  • VIDEO - Bridge demolition going wrong
    June 17, 2015
    A bridge demolition job went spectacularly wrong in Finland recently. Luckily for all concerned, there were no casualties, but it could have quite easily been a different story. A demolition contractor was using an excavator fitted with a hydraulic breaker to break up the structure, but the work was carrying on despite live traffic flowing on the road under the bridge.

    Note too the behaviour of drivers on the route after the initial collapse.

    This video came just as the European Demolition Association headed to Finland’s capital Helsinki to discuss best practice.
  • Machine control technology shortens road contract
    May 28, 2013
    The use of sophisticated machine control technology has helped halve the schedule required for a road contract – Jeff Winke. By using the latest machine control systems on the equipment fleet, a US contractor has managed to halve worker hours, machine time and overall costs. “We chopped 50% off the contract schedule,” said Jim Swenson, licensed professional land surveyor for Oregon Mainline Paving based in McMinnville, Oregon. “The project was completed a year ahead of the two-year schedule,” he explained
  • Machine control technology shortens road contract
    May 28, 2013
    The use of sophisticated machine control technology has helped halve the schedule required for a road contract – Jeff Winke. By using the latest machine control systems on the equipment fleet, a US contractor has managed to halve worker hours, machine time and overall costs. “We chopped 50% off the contract schedule,” said Jim Swenson, licensed professional land surveyor for Oregon Mainline Paving based in McMinnville, Oregon. “The project was completed a year ahead of the two-year schedule,” he explained.