Skip to main content

Lift off for Terex’s AggreSand 206

January 6, 2017
Terex Washing Systems’ AggreSand 206 wash plant is capable of handling up to 400 tonnes of material every hour, allowing customers to produce more – and better quality – grades, with a number of installations planned worldwide.
Exhibitions

Related Content

  • Beton bets on Amman’s CBS 120 SL Elba Concrete Mixing Plant
    May 15, 2019
    Ammann has assembled a plant that it says is highly competitive on price and performance for its customer Thomas Beton, a concrete supplier near Hamburg. Thomas Beton is among the leading producers of high-quality ready-mix concrete in northern Germany with daily deliveries to infrastructure sites as well as residential, commercial, industrial and agricultural projects. The new Ammann plant – the ninth Ammann-Elba solution for Beton – means that Beton is strengthening its local physical proximity to cu
  • Telsmith launches a high-output 820 tracked screening plant at Conexpo 2014
    January 6, 2017
    Among new crushing and screening products showcased by Telsmith at Conexpo 2014 this week, a new 820 tracked screening plant was taking centre stage offering users high throughput volumes. The plant includes an 8203 Telsmith TL screen; 1,372mm feed conveyor, an 1,829mm under screen conveyor, all combined to process up to 907tonnes/hour.
  • Telsmith launches a high-output 820 tracked screening plant at Conexpo 2014
    March 4, 2014
    Among new crushing and screening products showcased by Telsmith at Conexpo 2014 this week, a new 820 tracked screening plant was taking centre stage offering users high throughput volumes. The plant includes an 8203 Telsmith TL screen; 1,372mm feed conveyor, an 1,829mm under screen conveyor, all combined to process up to 907tonnes/hour.
  • The dark arts of asphalt production
    January 5, 2017
    Asphalt production is a complex process featuring many variables - Mike Varner, chief engineer at Astec Inc discussed methods with Mike Woof Asphalt production in a black art in more ways than one. It involves a complex process of mixing bitumen with aggregates under temperature and optimising this operation is crucial to maximise quality. But with so many variables, determining exactly what is going on inside an asphalt plant involves extensive research, sophisticated computer modelling and the use of a