Skip to main content

Lift off for Terex’s AggreSand 206

January 6, 2017
Terex Washing Systems’ AggreSand 206 wash plant is capable of handling up to 400 tonnes of material every hour, allowing customers to produce more – and better quality – grades, with a number of installations planned worldwide.
Exhibitions

Related Content

  • Increased asphalt demand - meeting the challenge
    February 8, 2012
    With demand for asphalt predicted to increase, manufacturers are ready to meet the challenge as Patrick Smith reports
  • Sandvik plant increases productivity
    December 3, 2012
    Lafarge Aggregates Malaysia’s Kulai quarry is designed to the highest standards of safety, productivity and efficiency With an emphasis on high standards of safe, efficient and productive operations, Lafarge Aggregates Malaysia recently installed new quarry plant. It became operational earlier this year after Sandvik Mining and Construction Malaysia designed and installed a 250tonnes/hour, four-stage crushing and screening plant in Kulai, Johor, some 270km south of the capital Kuala Lumpur. It is now fully
  • Glass ceiling breakthrough for Ammann in Australia
    November 18, 2019
    An Ammann ABP High Recycling Technology (HRT) asphalt mixing plant is a key part of an Australian recycled glass-for-asphalt scheme.
  • Versatile mix plant from Fayat
    September 11, 2018
    Fayat’s Marini-Ermont division is now offering a new addition to its Roadmaster range: the RM 120 Allroad. This plant has been designed to allow road contractors to produce a range of high-quality asphalt types at very low cost. The RM 120 Allroad is also designed to be very mobile, offering outputs ranging from 50-120tonnes/hour and capable of reusing up to 40% RAP. According to the firm, the plant is ideal for small- and medium-sized moving sites and can produce high-quality hot- or warm-mix asphalts wi