Skip to main content

Lift off for Terex’s AggreSand 206

January 6, 2017
Terex Washing Systems’ AggreSand 206 wash plant is capable of handling up to 400 tonnes of material every hour, allowing customers to produce more – and better quality – grades, with a number of installations planned worldwide.
Exhibitions

Related Content

  • CONEXPO Introduction for Terex Finlay’s new J-1170 primary mobile jaw crusher
    January 24, 2014
    Nigel Irvine, Terex Finlay sales and marketing director says the company’s new J-1170 high performance primary mobile jaw crusher’s 45tonne transport weight and compact dimensions mean lower transport costs between and within crushing sites. Built around the Terex 1,100mm x 700mm jaw crusher and with a proven track record in recycling, aggregate production and mining applications, the machine is said to offer excellent material reduction and product sizing in the processing of blasted quarry rock and ore m
  • Intelligence built in to Dynapac machines
    January 16, 2017
    The highly sophisticated Fleetlink telematics system developed is now being offered across the road machine range. The system allows users to optimise fleet usage and reduce maintenance costs, boosting overall efficiency and fleet management and increasing uptime and productivity.
  • Ammann develops versatile and productive mobile asphalt plant
    February 9, 2015
    Ammann claims that its new EcoBatch asphalt plant offers versatility and mobility in a single compact package. This modular plant can deliver 60-80tonnes/hour of high quality material for use in demanding road construction applications. The plant is said to be optimised to reduce wear and maintenance needs, with easy access for servicing. Jean-Luc Didier is sales director for Central-South Europe and said, “It has the same control system and accuracy in dosing as we have in the big plants. There’s no need f
  • Ammann develops versatile and productive mobile asphalt plant
    January 6, 2017
    Ammann claims that its new EcoBatch asphalt plant offers versatility and mobility in a single compact package. This modular plant can deliver 60-80tonnes/hour of high quality material for use in demanding road construction applications. The plant is said to be optimised to reduce wear and maintenance needs, with easy access for servicing. Jean-Luc Didier is sales director for Central-South Europe and said, “It has the same control system and accuracy in dosing as we have in the big plants. There’s no need f