Skip to main content

Lift off for Terex’s AggreSand 206

January 6, 2017
Terex Washing Systems’ AggreSand 206 wash plant is capable of handling up to 400 tonnes of material every hour, allowing customers to produce more – and better quality – grades, with a number of installations planned worldwide.
Exhibitions

Related Content

  • Engine innovations unveiled
    August 24, 2023
    The recent CONEXPO-CON/Agg exhibition in Las Vegas saw major engine firms unveiling innovative new technologies
  • Terex Cranes is bullish with strong results
    February 25, 2019
    Terex Cranes reports strong financial performance, with fourth quarter 2018 net sales of $1.2 billion. This performance is an increase of 16% compared with the $1.1 billion achieved for the fourth quarter of 2017. For the full year 2018, Terex reported net sales of $5.1 billion, an increase of 18% over the $4.4 billion achieved for 2017. Meanwhile Terex has also announced it plans to to sell its Demag Mobile Cranes business to the Japanese firm Tadano. In addition, Terex Cranes will exit the mobile crane
  • Marini mobility option
    June 4, 2019
    Marini is offering new versions of its Xpress plant. The first version was the Xpress 2500, but the range is now being widened with the addition of the Xpress 1500, 1500P, 2000 and 2000P models. Andrea Zanoletti is in charge of this range and explained that the plants are designed for maximum mobility. He said, “With only two trailers, you have a complete asphalt plant.” The existing Xpress 2500 model offers an output of up to 250tonnes/hour. However, the new Xpress 1500 and 1500P offer outputs of 150
  • Machine control brings accuracy to US paving job
    November 2, 2012
    The historic city of Raleigh in North Carolina is one of the few cities in the US that was planned and built specifically to serve as a state capital and its population and traffic volume have grown enormously in recent years An indicator of Raleigh's growth has been the need for an expanded roadway system to serve Wake County. As early as the 1970s there were plans for a Western Wake Expressway. This developed into a 112km, interstate-grade beltway, known as the Raleigh Outer Loop, which will encompass Ral