Skip to main content

Lift off for Terex’s AggreSand 206

January 6, 2017
Terex Washing Systems’ AggreSand 206 wash plant is capable of handling up to 400 tonnes of material every hour, allowing customers to produce more – and better quality – grades, with a number of installations planned worldwide.
Exhibitions

Related Content

  • Hot-to-hot paving upgrades Bremen City Airport runway
    September 30, 2013
    A new high quality runway surface has been laid at Bremen City Airport. This has provided a much-needed replacement at the airport as the old runway was laid over 20 years ago and was suffering from cracking and potholes. Laying the new surface required the airport to be closed, with the work having to be carried out in a tight time schedule. Contractor Heitkamp Erd- und Straßenbau was brought in to carry out the work as the firm had experience in runway rehabilitation projects having carried out pavemen
  • In the fast lane at Indian F1 track
    June 21, 2012
    India’s new Formula 1 motor racing circuit, with its tight construction tolerances, demands considerable driving skill. More than 500 million people worldwide watched the first Formula 1 motor race in India's history. The drivers were thrilled by the new asphalt circuit with its numerous bends and the peripheral area around the new race track at Greater Noida near the capital New Delhi, which were built by machinery from German company Vögele (a member of the Wirtgen Group). Working with four Super 1800-
  • Reliable lifting for Terex crane in Saudi Arabia
    October 5, 2018
    A Terex TR 90 rough terrain crane has performed reliably and productively in tough operating conditions in Saudi Arabia. The crane was used for lifting numerous components for drilling rigs, generators, and a power distribution and control centre at a site for Nabros in Abqaiq, in Saudi Arabia. The machine was provided by Saudi Arabia-based heavy equipment service provider Expertise Contracting Company. The crane was transported to the work site in Abqaiq on a lowbed trailer, which took three hours to t
  • Lintec CSD2500B asphalt plan for Jordan
    December 9, 2024
    Installation and commissioning process of the Lintec CSD2500B containerised asphalt plant was completed in just one month, including delivery, testing and full operational setup.