Skip to main content

Lift off for Terex’s AggreSand 206

January 6, 2017
Terex Washing Systems’ AggreSand 206 wash plant is capable of handling up to 400 tonnes of material every hour, allowing customers to produce more – and better quality – grades, with a number of installations planned worldwide.
Exhibitions

Related Content

  • French Total expands with new PMB plant
    February 7, 2012
    A new PMB plant has opened in Dubai as part of the French Total Group's plans to expand in the Middle East. As part of the Total Group's plans for expansion in Middle East countries, a decision was taken in 2008 to include specific facilities dedicated to supply raw bitumen and to manufacture polymer modified bitumen (PMB).
  • High mobility is claimed for CIFA’s concrete plant
    January 6, 2017
    High mobility is claimed for CIFA’s mobile concrete batching plant, the CIFAMOBILE 50. “This is the first ever CIFA concrete batching plant we’ve built. It’s highly mobile and can be transported on wheels,” said Marco Brambati, director of marketing and business planning at the firm. The machine features a mixer that can produce 1/3 of concrete/cycle. This DNA 1.0 mixer is the smallest in the CIFA range (while the largest has a 3m3 capacity) and can deliver up to 50m3/hour of ready-mixed concrete. The plant
  • Developments in asphalt paver performance
    February 16, 2012
    Key additions will boost the asphalt paver offering for customers, Mike Woof reports. There are a number of key players in the asphalt paving market that see the value of investing in design, technology and performance. For customers this has resulted in a wide variety of high quality, high performance machines to choose from.
  • Quicker Plant set up with Superior
    May 20, 2016
    Superior Industries has developed a new system that speeds up the tricky operation of levelling a portable quarry plant installation. This new feature automatically levels a plant once the machinery is raised to the necessary height. Previously operators would have to adjust cribbing and jacks until a level plant was achieved. This operation has to be carried out properly as when operating in an uneven environment, plants can produce material that is out of specification, as well as suffering overstresse