Skip to main content

Kristina's World of Concrete Part 2: TamiSoft by Autom'elec

April 22, 2015
Kristina takes a look at the TamiSoft machine which offers granular measurement of aggregate chunks. The system triangulates Laser beams reflected off the aggregate into a camera, which records up to 1000 measurements per second.
No video provider was found to handle the given URL. See the documentation for more information.
Exhibitions

Related Content

  • Novel demolition machines
    May 9, 2023
    The market for ruggedised demolition excavators has very specific requirements, with three new models now available – Mike Woof writes
  • Bitumen technology specialists work to lower embodied carbon
    April 5, 2021
    A novel recipe for bitumen combines chemicals extracted from naturally occurring asphalt with a product created from cashew nut shells. Called ‘Instant Asphalt’, the idea is the brainchild of Frank Albrecht, managing of Albrecht Supply Concepts, which specialises in bitumen engineering.
  • Intermat launch for more Cat E-series excavators
    April 11, 2012
    Caterpillar is introducing a revised line-up of 20-24 tonne E Series crawler excavators at Intermat 2012. The 320E, 323E and the reduced radius 320E RR adopt the EU Stage IIIB Cat C6.6 ACERTTM engine, providing reduced emissions and fuel consumption savings of up to 11% compared to other D Series models. A wider range of cab seating, including heating and cooling options, comes with the new E Series crawler excavators. Time delay lighting, additional safety handrails and improved serviceability are also sai
  • Set the ALARM for repairs in England and Wales
    January 10, 2019
    More than 3,900km of roads in England and Wales will need essential maintenance within the next year, according to the annual ALARM survey* Cash-strapped local governments are reporting that the gap between the funds they received and the amount they needed for repairs and maintenance was almost €639 million. This equated to an average shortfall of €3.75 million for every authority. It would take 14 years to get local roads back into a reasonable steady state, but only if adequate funds and resources wer