Skip to main content

Gold Lot & Hall

January 11, 2017
Over 230,000 square feet and 390+ exhibitors displaying the latest in concrete construction, information technology, trucking, safety & traffic, infrastructure support & more.
Exhibitions

Related Content

  • Using breakers to demolish redundant overpass
    December 11, 2015
    A demolition job in California was carried out successfully using a hydraulic breaker fitted to an excavator. An overpass on Highway 91 in Southern California had to be removed, with the contractor opting to use a hydraulic breaker for the job. The work was carried out within the 22-hour possession period set by the local authorities, allowing the route to reopen to traffic on time and minimising transport delays. The work was carried out safely and precisely, due to the use of suitable equipment. The re
  • New barriers coming to market worldwide
    July 28, 2015
    European and US manufacturers traditionally hold strong positions in the global market for road safety barrier systems. The strength of the European and US testing systems and processes as well as their respective legislation have helped this position. Both European and US standards for road safety barriers are well understood in other territories and are also accepted in many countries around the globe.
  • Vysionics helps Scottish watchdog A9 Safety Group win CIHT award
    September 16, 2015
    An installation of SPECS3 average speed cameras from Vysionics has helped a Scottish road safety watchdog win an award The A9 Safety Group, which monitors traffic, accidents and driving habits and conditions along the A9 trunk road, picked up the John Smart Road Safety Award from the CIHT - Chartered Institution of Highways and Transportation. The CIHT is concerned with planning, design, construction, maintenance and operation of land-based transport systems and infrastructure. A9 Safety won the award
  • PERI fills gap in Greek market
    February 19, 2013
    A team of Greek and German PERI engineers have developed a comprehensive formwork and scaffolding solution for the T4 bridge on the A7 motorway in Greece. The 160km long A7 connects Kalamata in the south to Corinth in the northwest of the Peloponnese peninsula. On one stretch of the motorway a 390m long arched bridge – known as T4 – is being used to close the gap between Paradisia and Tsakona. Set for completion in early 2014, two-thirds of the 22m wide bridge superstructure will be suspended on a steel arc