Skip to main content

Fatal bridge demolition incident in US

January 20, 2015
A fatal bridge collapse occurred in the US State of Ohio. The structure was under demolition when it collapsed. A demolition job was being carried out on the bridge when it collapsed unexpectedly, killing one of the workers in the process. A truck crashed into the debris as it collapsed but its driver escaped serious Injury. The bridge was located on I-75, close to the city of Cincinnati. The problem of ageing bridge structures is serious in the US and in Ohio, around one in five bridges are in need of replacement.

Related Content

  • Alberta eyes La Crete Ferry replacement
    September 2, 2020
    The Canadian province is considering a toll bridge over the Peace River.
  • ARTBA presents transport safety awards
    October 1, 2015
    The American Road & Transportation Builders Association’s Transportation Development Foundation (ARTBA-TDF) has presented awards to five separate industry initiatives. These were highlighted for commitment to promoting safety during the association’s 17th annual Roadway Work Zone Safety Awareness Awards held recently at a luncheon during ARTBA’s National Convention in Philadelphia. The competition recognises outstanding programmes, campaigns and technologies aimed at helping reduce roadway work zone a
  • UAE highlights crashes with heavy vehicles
    May 13, 2014
    The authorities in the UAE have released data showing that over the past 15 years, at least 224 people were killed in crashes involving mini-vans, buses and trucks on the country’s roads. For the most part the fatalities involved workers going to, or coming back from, work and on stretches of major highways with speed limits of 100km/h. The deaths averaged 14/year. Records show the crashes were due to largely to reckless driving by the drivers of the heavy vehicles.
  • Mobile Barriers develops crane-and-bucket for Mobile Barrier MBT-1
    November 7, 2017
    Mobile BarrierMobile Barriers has developed a crane with a hook-and-bucket setup for the company’s Mobile Barrier MBT-1. The crane-and-bucket combination is positioned on its own 3m removeable wall section and provides a 9.15m reach and a capacity of 3900kg at base and 680kg at 9.15m. The unit can be operated from the ground or bucket via wireless controls. The bucket can be rotated out of the way or removed when not in use. Physical Stop points ensure that the crane and bucket do not encroach on live lanes