Skip to main content

Explosive demolition works for US Bridge

January 19, 2015
A successful explosive demolition project for an old bridge has been carried out in the US state of Missouri. The Fairfax Bridge was constructed in 1935 and was no longer able to meet current transportation needs. Some 760m long the bridge was carrying around 6,000 vehicles/day. Another bridge was also opened nearby, the Platte Purchase Bridge, in 1957 to help the original structure carry the necessary traffic volumes. Removing the old structure of the Fairfax Bridge as well as the Platte Purchase Bridge and replacing them with a new bridge is costing around US$79 million. The new bridge will open to traffic in late 2016.

Related Content

  • Explosive demolition for Kansas City bridge
    June 9, 2014
    Explosive demolition was used to remove an aged bridge in Kansas City on Saturday 7th June.
  • VIDEO – Explosive blast apart redundant US bridge
    July 13, 2015
    The Donora-Webster Bridge over the Monongahela River in the US has been demolished using explosives. The ageing structure spanned the Monongahela River, connecting Washington and Westmoreland Counties in Pennsylvania. The bridge was built in 1908 and originally carried a rail link but in 1938 the tracks were removed and the structure was modified so that it could handle motor vehicle traffic instead. The Donora-Webster Bridge linked Route 837 on the west side of the Monongahela River with Route 906 on the east bank.
  • Bridge demolition with breakers
    May 5, 2021
    Hydraulic breakers from Italian firm Indeco have been used successfully to carry out important work on the Princes Freeway in Australia’s Victoria State.
  • Tennessee highway bridge explosive demolition VIDEO
    September 23, 2014
    Explosive demolition has been used to remove a Tennessee bridge that no longer met requirements. The bridge was on Tennessee Interstate 65 near Franklin in Williamson County and has been removed by a specialist contractor. The highway authorities decided to demolish the bridge following a crash involving a tanker truck in August of this year. The structure was pre-drilled with explosive charges and then demolished remotely, with the explosive demolition being carried out successfully and without any injurie