Skip to main content

Explosive bridge demolition continues in US

February 4, 2015
Planned demolition work continues on the Chain of Rocks Bridge in the US. The second of three planned blasts has now been carried out, successfully dropping another section of the structure into the canal beneath. The bridge used to carry Interstate 270 but has been replaced with a new structure lying close at hand. The old bridge lies just to the north of the city of St Louis, with the eastern end of the structure on Chouteau Island in Illinois and the western end is in Missouri.  The final section of the bridge will be removed in due course.

Related Content

  • US$4 billion bridge and highway project
    June 14, 2024
    A US$4 billion bridge replacement and highway upgrade project is planned for the US.
  • Building an airport for St Helena
    August 29, 2013
    The remote South Atlantic island of Saint Helena will shortly benefit from the construction of a new airport as well as access roads and supporting infrastructure. This is the biggest construction project in the history of the island, which lies nearly 2,000km off the coast of Africa. The airport is expected to boost economic development for the island’s 4,000 residents with an estimated 20,000 people a year forecasted to visit this highly remote, 122km2 equatorial volcanic outcrop. At present the islan
  • US$1.3 billion Chilean road tender delayed
    June 19, 2024
    The tender for a US$1.3 billion Chilean road project is being delayed.
  • Launch soon for the Sunderland Bridge’s deck across the Wear
    March 24, 2017
    The team constructing the New Wear Crossing near the English city of Sunderland is preparing for the final launch of the 300m bridge deck. In recent weeks, the legs of the 100m-tall centrepiece have been secured to the foundations within the riverbed and most of the rigging used to raise it into place has been removed. While the bridge deck was being painted, the bottoms of both pylon legs were filled with 175tonnes of concrete, The next major process will be to slowly pull the bridge deck out acr