Skip to main content

Explosive bridge demolition continues in US

February 4, 2015
Planned demolition work continues on the Chain of Rocks Bridge in the US. The second of three planned blasts has now been carried out, successfully dropping another section of the structure into the canal beneath. The bridge used to carry Interstate 270 but has been replaced with a new structure lying close at hand. The old bridge lies just to the north of the city of St Louis, with the eastern end of the structure on Chouteau Island in Illinois and the western end is in Missouri.  The final section of the bridge will be removed in due course.

Related Content

  • ARTBA calls for more bridge repairs in US
    February 18, 2016
    The American Road & Transportation Builders Association (ARTBA) is calling for more bridge repairs in the US. There are still too many structurally deficient bridges in the US according to a recent analysis. This report states that while there were 2,574 fewer structurally deficient bridges in 2015 compared to the number in 2014, there are still 58,500 on the structurally deficient list. Worse still, at the current pace of bridge investment it will take at least 21 years before these bridges are all replace
  • Barge-mounted Manitowoc MLC300 lists Illinois bridge into place
    June 28, 2018
    The reduced footprint and floating counterweight meant that it is much more efficient for contractors to barge-mount a crawler crane. The crane can be on smaller water-based barges because the machine automatically adjusts its centre of gravity for each lift. Kraemer North America recently used an MLC300 to help replace an 84-year-old truss bridge, the 756m Savanna-Sabula Bridge near Savanna, in the US state of Illinois. The Savanna–Sabula Bridge was a truss bridge and causeway crossing the Mississippi Ri
  • Louis Berger wins key India bridge deal
    January 10, 2018
    Louis Berger has been awarded the management contract for the Versova-Bandra Sea Link project in India. The US$17 million project management services deal was awarded to the firm by the Maharashtra State Road Development Corporation (MSRDC). The construction of the Versova-Bandra Sea Link (VBSL) is estimated to cost some $1 billion and will take 54 months to complete. “We are honored to play a major role in one of the largest infrastructure projects — not just in Mumbai, but in India,” said Kshitish
  • Stockholm’s new bypass
    March 8, 2021
    Tunnels make up 18km of the 21km of the Swedish capital’s E4 Bypass mega-project. It will have taken 15 years from start to opening in 2030, if all goes well