Skip to main content

Central Hall

January 11, 2017
Over 300,000 square feet and 230+ exhibitors displaying the latest in aggregate processing, asphalt production & paving, & more
Exhibitions

Related Content

  • Bauma opens today
    October 24, 2022
    The doors will be thrown wide open today for the event is at the Trade Fair Center Messe München in Munich where thousands of attendees are expected the week-long fair.
  • Vögele introduces new spray paver
    February 9, 2015
    Vögele is introducing a new generation SprayJet model, built around its latest Super 1800-3i asphalt paver. Like its predecessor, the new machine features an add-on emulsion tank and spraybars and is designed to both spray emulsion and carry out asphalt paving. Anja Sehr of the firm’s marketing and communications department said, “This does two steps in one.” She added that using this type machine boosts paving quality, as the SprayJet can ensure a homogenous layer of emulsion is spread over the surface, be
  • Vögele introduces new spray paver
    January 6, 2017
    Vögele is introducing a new generation SprayJet model, built around its latest Super 1800-3i asphalt paver. Like its predecessor, the new machine features an add-on emulsion tank and spraybars and is designed to both spray emulsion and carry out asphalt paving. Anja Sehr of the firm’s marketing and communications department said, “This does two steps in one.” She added that using this type machine boosts paving quality, as the SprayJet can ensure a homogenous layer of emulsion is spread over the surface, be
  • Beijing airport runway features novel asphalt solution
    December 7, 2017
    Beijing ranks amongst the five busiest airports across the globe and its runway surfaces face tough stresses as a result. Over 94 million passengers flew through Beijing Capital Airport (BCA) in 2016 and as many as 70 flights/hour can take off and land during peak times. The 60m-wide middle runway of Beijing Capital International Airport is the busiest of the three runways, with a landing and take-off flight ratio of up to 40%. This runway was first rehabilitated in 1996 and then repaired in 2013 and 2015