Skip to main content

California bridge demolition project proceeding to plan

March 2, 2015
Demolition work is proceeding to plan on the old Bay Bridge in California. The structure is being removed piece by piece in a tightly controlled demolition project being carried out by a number of specialist firms. Strict guidelines cover how the demolition workers can proceed, with regulations preventing debris from falling into the water for example. Safety of the demolition personnel is another of the key criteria. The new bridge is already carrying traffic alongside but the old steel cantilever structure can only be removed in sections and this has meant certain parts of the new link cannot be completed until the original structure has been taken down. The project team will remove the old bridge down to the water level but discussions are underway at present in how best to remove its foundations underwater also. By the end of 2016, the old structure should be completely removed however.

Related Content

  • Long reach equipment simplifies demolition
    February 14, 2012
    Demolition is a highly specialised business, as the machinery required to carry out the work on high-rise demolition contracts can be very site specific. Today's high reach demolition rig is no longer simply a tracked excavator with a long boom, indeed some machines cannot be used as excavators at all. Likewise a machine that is dedicated to carrying a 2.5 or 3tonne shear or hammer will need to be built to take the stresses and strains of demolition life.
  • Long reach equipment simplifies demolition
    April 13, 2012
    Demolition is a highly specialised business, as the machinery required to carry out the work on high-rise demolition contracts can be very site specific. Today's high reach demolition rig is no longer simply a tracked excavator with a long boom, indeed some machines cannot be used as excavators at all. Likewise a machine that is dedicated to carrying a 2.5 or 3tonne shear or hammer will need to be built to take the stresses and strains of demolition life. Many of the ultra long boom machines are designed
  • VIDEO: West Virginia bridge demolition project
    November 23, 2015
    Locals turned out in large numbers to watch the demolition of a redundant bridge in West Virginia on the east coast of the US. The 65 year old bridge located near the town of Lilly was removed by a specialist demolition crew following careful preparations. The area now has a new bridge as the old steel cantilever truss structure was no longer able to cope with local traffic needs. The remains of the old bridge, one of the last cantilever steel structures in the state, are now being cut up for scrap.
  • Korean bridge construction poses challenges
    February 23, 2012
    On South Korea's southern coast, an innovative highway sea crossing is providing many engineering challenges