Skip to main content

California bridge demolition project proceeding to plan

March 2, 2015
Demolition work is proceeding to plan on the old Bay Bridge in California. The structure is being removed piece by piece in a tightly controlled demolition project being carried out by a number of specialist firms. Strict guidelines cover how the demolition workers can proceed, with regulations preventing debris from falling into the water for example. Safety of the demolition personnel is another of the key criteria. The new bridge is already carrying traffic alongside but the old steel cantilever structure can only be removed in sections and this has meant certain parts of the new link cannot be completed until the original structure has been taken down. The project team will remove the old bridge down to the water level but discussions are underway at present in how best to remove its foundations underwater also. By the end of 2016, the old structure should be completely removed however.

Related Content

  • Germany builds its first major PPI autobahn project
    July 7, 2015
    Rebuilding of one of the oldest motorways in Germany is testing out the possibilities for public-private project road construction reports Adrian Greeman A freshly renovated section of the A8 Autobahn in southern Germany will be watched with some interest this summer as traffic begins driving along its rebuilt carriageway and additional third lanes. That is not because of any special road features, other than a distinctive reddish colour to its concrete surface, but because it is a first fullscale public
  • Turkey’s new Marmara Highway project
    June 8, 2017
    By the end of 2018, a shiny new strip of asphalt will skirt around Turkey’s largest city, Istanbul, providing a new transport connection.
  • Major Necaxa-Tihuatlan Highway project for Mexico
    October 1, 2014
    A new highway in Mexico is connecting Necaxa with Tihuatlan and the project features challenging terrain - Mauro Nogarin reports In Mexico a landmark highway project is now close to completion, having set a number of records for Latin America.
  • The Mersey Gateway bridge project continues on schedule
    October 18, 2016
    Work continues on the 2.3km Mersey Gateway signature bridge project close to Liverpool in the UK. David Arminas reports on some of the construction highlights. Under construction is a cable-stayed structure with three towers that will span the Mersey River’s expansive mud flats between the towns of Runcorn and Widnes near Liverpool. Including the approach viaducts on each side, it will be 2.3km long with a river span of 1km. The main bridge deck will be reinforced concrete. The 80m-high central tower will b