Skip to main content

Breakers break up bridge in US state of Mississippi

January 19, 2015
A US contractor has carried out a successful demolition job on a bridge using excavators fitted with hydraulic breakers. The fleet of 178 Caterpillar excavators used for the work managed to break up the ageing structure in just 11 hours. The old Pigeon Roost road bridge will now be replaced with another, more modern structure better able to carry the necessary traffic load. The 1500 Mississippi Department of Transportation filmed the job using time lapse techniques to show the 11 hour job condensed into just 49 stunning seconds.

For more information on companies in this article

Related Content

  • Asphalt resurfacing at Miami International Airport
    February 8, 2012
    Improvements worth US$30 million are being carried out at Miami International Airport. The work includes runway resurfacing with specialist contractors having been brought in to handle the project. This is a busy facility handling some 34 million passengers/year and the work is being carried out over a period of 454 days in all, starting in September 2009 and due to finish in December 2010. The focus of attention is the upgrade to the airport's second longest runway, 8R 26L as well as the adjoining M and N
  • VIDEO: Broadway Bridge defies demolition experts, for a time
    October 12, 2016
    A 100-year old steel arch bridge in the United States stood firm for a time against the blasts laid down by demolition experts.

    The structure connected the cities of Little Rock and North Little Rock in the state of Arkansas. It carried U.S. Route 70 but was finally closed on 28 September.

    Although Broadway Bridge, spanning the Arkansas River, was built almost a century ago, the steel arches were added 60 years later as part of a strengthening project to the under-structure to widen the river navigation channel.
  • Florida replacing Howard Frankland Bridge
    August 22, 2018
    Florida Department of Transportation (FDOT) is working on plans to replace the Howard Franklin Bridge. The project is now expected to cost US$814 million, an increase from the $750 million originally envisaged. The contract is expected to be awarded in 2019, with construction commencing in 2020. The first stage of the project should be ready for use in 2024, providing a significant increase in daily capacity and boosting the emergency evacuation capacity also. The new bridge will carry four lanes of traffi
  • Manitowoc crane helps construct new Illinois bridge
    December 15, 2017
    A barge-mounted crane from Manitowoc is playing a key role in a major Illinois bridge replacement project. The machine is being used by Kraemer North America, which is replacing an 84-year-old truss bridge near Savanna, Illinois. The firm is employing a barge-mounted MLC300 equipped with the sophisticated variable position counterweight (VPC) technology, which is said to allow the MLC300 to adjust its counterweight during each lift and keep the barge stable while lifting. When Manitowoc introduced its VPC