Skip to main content

Breakers break up bridge in US state of Mississippi

January 19, 2015
A US contractor has carried out a successful demolition job on a bridge using excavators fitted with hydraulic breakers. The fleet of 178 Caterpillar excavators used for the work managed to break up the ageing structure in just 11 hours. The old Pigeon Roost road bridge will now be replaced with another, more modern structure better able to carry the necessary traffic load. The 1500 Mississippi Department of Transportation filmed the job using time lapse techniques to show the 11 hour job condensed into just 49 stunning seconds.

For more information on companies in this article

Related Content

  • Doha’s massive ring road expressway project
    July 10, 2019
    The huge Doha ring road project will help decongest the city and improve transport for Qatar
  • Novel dual layer paving work in Germany
    February 2, 2017
    A German contractor is now using two novel asphalt paving technologies from Vögele together for key projects The firm has acquired Vögele’s InLine Pave equipment with its innovative dual layer paving technology as well as one of the SUPER 1800-3i SprayJets for paving a surface course. This combination of technologies is allowing contractor Rask Brandenburg to carry out fast and efficient road rehabilitation work on some major routes, including a busy Autobahn stretch leading into capital Berlin. T
  • $1.49 billion for Oregon-Washington bridge
    August 26, 2024
    The existing Interstate 5 bridge connecting Portland and Vancouver over the Columbia River in the US northwest is actually two parallel bridges – one dating back to 1917.
  • Washington DC’s historic bridge replacement project
    June 11, 2019
    The project to replace a historic bridge in US capital Washington DC is providing major challenges for its builders - Mike Woof writes