Skip to main content

Brazil’s budget cuts threaten the Santos-Guaruja immersed tunnel

August 18, 2015
Adjustments to Brazil's budget could pose a threat to the planned immersed tunnel between Santos and Guaruja in Sao Paulo state, local media reported.

Sao Paulo state had put the project out to tender and had verbal support from the national treasury to borrow up to US$2 billion to finance the project. However, because of the economic crisis, this support has not materialised.

The tunnel would by 1.7km long, carry six lanes of traffic and be at an estimated depth of 35m.

Out of $918 million needed for the tunnel, Brazil's national development bank BNDES had already approved $269 million while the state of Sao Paulo had committed $258 million, leaving a $373 million gap. Sao Paulo state has half the resources needed already but it will not go ahead with the project until all the funds are available, local media reported.

Out of five consortia that presented a commercial proposal, four are prequalified: ISG Interligacao Santos-Guaruja, made of 1339 Andrade Gutierrez, 3086 Daewoo and CR Almeida; Nova Travessia, made of Constran, Ing E Mantovani and Piacentini Tecenge do Brasil; Tunel Santos-Guaruja, made of 1305 Odebrecht, Queiroz Galvao, 1511 OAS and Strukton; Sigma, made of J Malucelli Construtora de Obras, Grandi Lavori and 7809 Salini Impregilo; and Construtor Tunel Santos-Guaruja, made of Camargo Correa, 2717 Ferrovial Agroman and Carioca Engenharia.

Sao Paulo’s state highway agency 2529 Dersa has produced a video of the proposed submerged tunnel.

For more information on companies in this article

Related Content

  • Brazil roads tenders attracting interest
    January 31, 2017
    Strong interest is being reported in two road project tenders in Brazil. The tenders are being handled by Artesp, the transport agency for Sao Paulo State. So far as many as 140 interested parties have registered for the tenders of two roadway stretches. The first of these tenders will be auctioned on the 22nd February 2017 while the second will be auctioned on the 25th April 2017. These interested parties include at least 30 road operators and 15 banks, and include firms from Europe, Asia and the Middle Ea
  • LiuGong’s Zeng Guang’an Spoke on the Development of the Manufacturing Industry at China’s National People’s Congress
    May 14, 2018
    The first session of the 13th National People's Congress (NPC) opened in the Great Hall of the People in Beijing recently. Chinese premier Li Keqiang delivered the annual report on the work of the government at the opening ceremony. Zeng Guang’an, NPC deputy for Guangxi Zhuang Autonomous Region and chairman of Guangxi Liugong Group, attended the conference. Zeng Guang’an listened to the Government Report and participated in the panel discussion of Guangxi Zhuang Autonomous Region. He reported to premier Li
  • Support for underground tunneling work
    May 11, 2015
    The Brenner Base Tunnel is a key transport link and the use of the latest technology for support works has been played an important role. Work on the tubes of the Brenner Base Tunnel, one of the largest underground infrastructure projects underway at present, is seeing the use of sophisticated equipment. Excavation of the new Tulfes-Pfons section commenced in the third quarter of 2014 and the route will form part of the TEN Axis connection between Helsinki to Valletta. The new section, worth around €
  • Guatemala seeks US$920mn of international loans for fast motorways
    December 16, 2013
    Guatemala’s Ministry of Communications, Infrastructure and Housing is seeking international loans of US$920 million to transform three national road sections into fast motorways. The loans could be obtained at some stage in 2014. One negotiated with the Central American Bank for Economic Integration (CABEI), of $280 million for the widening of CA-2 Oriente motorway to a four-lane motorway, is reportedly at its final stage. The bank has given its approval already and it is only the Monetary Council that has