Skip to main content

Brazil’s budget cuts threaten the Santos-Guaruja immersed tunnel

August 18, 2015
Adjustments to Brazil's budget could pose a threat to the planned immersed tunnel between Santos and Guaruja in Sao Paulo state, local media reported.

Sao Paulo state had put the project out to tender and had verbal support from the national treasury to borrow up to US$2 billion to finance the project. However, because of the economic crisis, this support has not materialised.

The tunnel would by 1.7km long, carry six lanes of traffic and be at an estimated depth of 35m.

Out of $918 million needed for the tunnel, Brazil's national development bank BNDES had already approved $269 million while the state of Sao Paulo had committed $258 million, leaving a $373 million gap. Sao Paulo state has half the resources needed already but it will not go ahead with the project until all the funds are available, local media reported.

Out of five consortia that presented a commercial proposal, four are prequalified: ISG Interligacao Santos-Guaruja, made of 1339 Andrade Gutierrez, 3086 Daewoo and CR Almeida; Nova Travessia, made of Constran, Ing E Mantovani and Piacentini Tecenge do Brasil; Tunel Santos-Guaruja, made of 1305 Odebrecht, Queiroz Galvao, 1511 OAS and Strukton; Sigma, made of J Malucelli Construtora de Obras, Grandi Lavori and 7809 Salini Impregilo; and Construtor Tunel Santos-Guaruja, made of Camargo Correa, 2717 Ferrovial Agroman and Carioca Engenharia.

Sao Paulo’s state highway agency 2529 Dersa has produced a video of the proposed submerged tunnel.

For more information on companies in this article

Related Content

  • Consortium competing for concession contract in Brazil
    August 29, 2014
    The tender process for a major highway project in Brazil attracted only one offer. The tender concerns a 66km stretch of the northern metropolitan road in Belo Horizonte, Minas Gerais State. The offer came from the Rota Metropolitana Norte consortium, comprising Odebrecht TransPort with a 60% share and EcoRodovias and Barbosa Mello Participacoes e Investimentos with 20% each. The deal has yet to be confirmed. Once signed, the contract will be valid for 30 years with the possibility that it could be then ext
  • New Holland graders for Brazil
    May 28, 2013
    The state of Minas Gerais, Brazil, has received New Holland machines that will be used to combat drought and develop infrastructure. At the delivery ceremony in Ribeirão das Neves, Belo Horizonte metropolitan area, President Dilma Rousseff handed over 58 model RG140.B graders to several local administrations in northern Minas Gerais state. The machines will be used in the reconstruction of roadways that link rural areas to urban zones, and they were acquired by the Ministry of Agrarian Development (MDA) in
  • A new tolled highway is planned for Virginia in the US
    October 26, 2012
    In the US State of Virginia plans are now moving forward for construction of the US$460 tolled highway. This 88km route will connect Petersburg and Suffolk and will cost $1.4 billion to construct. A consortium headed by Spanish firm Ferrovial Agroman has qualified to handle the design, build, finance deal for the project. The package of works also includes building junctions for the highway to connect with seven existing roads. The financing of the project has still to be completed but this stage is expect
  • The Construction Equipment Association will deliver a trade mission to Brazil
    April 10, 2012
    The UK Trade & Investment (UKTI) has appointed the Construction Equipment Association (CEA) to deliver an extended Trade Mission to Brazil for as $US5 billion infrastructure and mining development project. The CEA will deliver a UK Information Share Fair and extended Trade Mission to Brazil to promote an opportunity for UK manufacturers and service providers. The $S5 billion project is for a new open pit iron ore mine in the north east of Brazil together with extensive infrastructure developments to improv