Skip to main content

Brazil’s budget cuts threaten the Santos-Guaruja immersed tunnel

August 18, 2015
Adjustments to Brazil's budget could pose a threat to the planned immersed tunnel between Santos and Guaruja in Sao Paulo state, local media reported.

Sao Paulo state had put the project out to tender and had verbal support from the national treasury to borrow up to US$2 billion to finance the project. However, because of the economic crisis, this support has not materialised.

The tunnel would by 1.7km long, carry six lanes of traffic and be at an estimated depth of 35m.

Out of $918 million needed for the tunnel, Brazil's national development bank BNDES had already approved $269 million while the state of Sao Paulo had committed $258 million, leaving a $373 million gap. Sao Paulo state has half the resources needed already but it will not go ahead with the project until all the funds are available, local media reported.

Out of five consortia that presented a commercial proposal, four are prequalified: ISG Interligacao Santos-Guaruja, made of 1339 Andrade Gutierrez, 3086 Daewoo and CR Almeida; Nova Travessia, made of Constran, Ing E Mantovani and Piacentini Tecenge do Brasil; Tunel Santos-Guaruja, made of 1305 Odebrecht, Queiroz Galvao, 1511 OAS and Strukton; Sigma, made of J Malucelli Construtora de Obras, Grandi Lavori and 7809 Salini Impregilo; and Construtor Tunel Santos-Guaruja, made of Camargo Correa, 2717 Ferrovial Agroman and Carioca Engenharia.

Sao Paulo’s state highway agency 2529 Dersa has produced a video of the proposed submerged tunnel.

For more information on companies in this article

Related Content

  • Analysing green Australian procurement practices
    December 16, 2014
    Adriana Sanchez and Keith Hampson of the Sustainable Built Environment National Research Centre (SBEnrc) discuss green procurement Procurement has a key role impacting the lifecycle of a construction project and can serve to drive many sustainability outcomes. Green procurement in particular can be used as a strategic tool to promote certain behaviour and as an environmental policy instrument to translate environmental policies into environmentally sustainable project processes, products and services. Th
  • Penta engines power biodiesel production
    October 20, 2023
    Binatural’s three BRG Slim 625kVA gensets powered by Volvo Penta's TAD-1641GE engines have undergone rigorous testing in Brazil.
  • JCB opens Brazilian factory
    December 3, 2012
    US$32.45 billion of infrastructure improvements are scheduled in Brazil and companies are looking to capitalise on this JCB’s new US$100 million factory in Brazil has been officially opened as the company strengthens its position in rapidly-expanding Latin American markets. At full capacity, the new plant will have the capability to produce 10,000 machines a year, and it replaces two smaller plants in Sorocaba, São Paulo State, the first of which JCB opened in 2001 to produce backhoe loaders, and the second
  • Highway projects underway in Brazil
    April 3, 2014
    Work is underway securing the finances for key highway projects in Brazil. The tender process for the US$1.72 billio Tamoios Highway project is now underway and the bids are due in mid-May 2014, according to Business News Americas. The project involves a 30 year concession package to operate and maintain the SP-99 Planalto and Serra stretches of the Tamoios highway, connecting the coastal cities of São José dos Campos and Caraguatatuba. The contract also involves 21.5km of road widening along the Serra stre