Skip to main content

BOMAG puts in a lap at Mandalika race track

Set on the tranquil Indonesian tourist island of Lombok, the Mandalika Street Circuit is set to become one of the most exciting tracks in the international motorcycle racing calendar.
November 23, 2021

The new MotoGP circuit for motorcycles is basically a street course but designed so that part of it is closed to public traffic during race weekends. The surface of a racetrack is crucial for the grip and tyre wear of the motorcycles. Therefore, the track surface must meet the highest standards.

BOMAG paving and compaction equipment was selected to install the asphalt elements of the track.

For paving the asphalt course layers, two BOMAG BF 800 C pavers where used. The compaction was done by 10 tonne BOMAG tandem rollers BW 161 AD-4 and pneumatic tyre rollers type BW 24 RH.

Exhibitions

For more information on companies in this article

Related Content

  • Speedy airport upgrade
    February 15, 2012
    Increases in flight numbers from the Frankfurt Hahn airport have resulted in necessary improvements to the facility, including new runway surfaces. The former German military airbase has been used as a civilian airport since 1993 but is now Germany's fifth largest air cargo hub and handles some 40,000 flights/year.
  • Major Pisa link gets upgrade
    February 29, 2012
    Recycling with foamed bitumen is being used for lane reconstruction on the SP11 road in Italy, where contractor F.lli Lepri is carrying out work on a 14km section. The SP11 is an important link forming part of the Colline per Legoli Highway connecting the SS67 Tosco-Romagnola Highway near Pontedera with the southeast region of Pisa Province up to the borders of Florence Province.
  • Wirtgen fleet helps build Romanian road
    December 17, 2013
    A fleet of Wirtgen machines is helping build a section of a major highway in Romania, the Transylvanian Autostrada A3. This 588km road connects Romanian capital Bucharest with the Hungarian border and links to the Hungarian M4 highway. Plans for the A3 got the go-ahead in 2004 and the route runs via Ploieti, Braov, Sighioara, Târgu Mure, Cluj-Napoca, Zalau and Oradea to the Hungarian border, with completion scheduled for 2017.
  • Tarmac to complete a lap of Silverstone F1 track in the UK
    May 9, 2019
    UK contractor Tarmac will complete a resurfacing lap of the Silverstone Formula One track in time for the British Grand Prix in July. A highly durable asphalt solution will be laid over 20 days in June and which has been specifically designed to withstand the high demands and stresses of vehicles competing in professional racing series. The track, in Northamptonshire, England, will also hold the motorcycle GoPro British MotoGP Grand Prix in August. The work will be carried out under the guidance of in