Skip to main content

BOMAG puts in a lap at Mandalika race track

Set on the tranquil Indonesian tourist island of Lombok, the Mandalika Street Circuit is set to become one of the most exciting tracks in the international motorcycle racing calendar.
November 23, 2021

The new MotoGP circuit for motorcycles is basically a street course but designed so that part of it is closed to public traffic during race weekends. The surface of a racetrack is crucial for the grip and tyre wear of the motorcycles. Therefore, the track surface must meet the highest standards.

BOMAG paving and compaction equipment was selected to install the asphalt elements of the track.

For paving the asphalt course layers, two BOMAG BF 800 C pavers where used. The compaction was done by 10 tonne BOMAG tandem rollers BW 161 AD-4 and pneumatic tyre rollers type BW 24 RH.

Exhibitions

For more information on companies in this article

Related Content

  • Innovation abounds at the smaller end of the compaction equipment sector
    August 22, 2013
    New machines are now being offered at the compact end of the asphalt compaction market - Mike Woof reports Manufacturers have developed an array of new machines and solutions for the compact end of the asphalt compactor market segment. These units have been designed to meet the latest regulations for Europe and the US, with low emission engines that are also more economical on fuel. But as these machines are made in large volumes, the market for smaller asphalt compactors sees fierce rivalry between fi
  • Cold recycling helps rebuild of Brazil’s Ayrton Senna highway
    September 28, 2015
    Brazil’s Ayrton Senna Highway has been rebuilt using cold recycling. Brazil’s SP-070 is also known as the Ayrton Senna Highway and is a major highway in the country, carrying heavy traffic volumes. For its rebuild, the time-saving, cost-efficient and eco-friendly benefits of the cold recycling process have been put to the test. The SP-070 provides a key transport link between São Paulo and Campos do Jordão, Vale do Paraíba and Rio de Janeiro, as well as being the main access route to Guarulhos Interna
  • Oscillation compaction advance in the US
    October 2, 2018
    A project carried out by LYNCH, one of the leading contractors in the south-east of New England, provided for the placement and compaction of asphalt on a road near Douglas, MA. A BOMAG BW 190 ADO-5 was used on the 3km section being redeveloped; this was assigned to work on the 60mm thick asphalt binder course and the 25mm thick top layer. The special feature of the project was in the application of the WMA process (Warm Mix Asphalt – low-temperature asphalt). In the course of this process, additive is add
  • Urban paving in cold weather
    February 23, 2018
    UK Contractor Elm Surfacing recently carried out a milling and repaving job in Brixton in London. The job was carried out on Brixton Water Lane, with the firm using Wirtgen milling machines to remove the top layers of asphalt from the road surface. Repaving was then carried out using a Vögele asphalt paver, with a large twin drum roller then being used to compact the surface. Asphalt paving was carried out in two layers, replacing the binder course and wearing course, although the original base course was l